NOMAD Science Phase Calibrations

This page lists calibration observations only, and is maintained by hand (so may be out of date)

Note that these are the predicted execution times. Real times could differ by up to 2 minutes

Typically there are only 1 or 2 calibrations allowed per MTP


SO: Detector window stepping: 1 step(s) covering detector lines 116 to 140 (1 step(s) per 1 second(s))
UVIS: SO: Vertical Bin (169:176;0:1047),Tint = 40 ms,20 bit,Rhythm = 334 ms, Binning=0

Solar line scan with SO and UVIS channel(s) in orbit nr. 1906
Solar line scan with SO and UVIS channel(s) on dayside nr. 78
Solar line scan with SO and UVIS channel(s) nr. 1
Solar line scan with SO and UVIS channel(s) in thermal orbit nr. 78 with orbit type nr. 1
TC20 execution start time (UTC): 2018 APR 28 02:33:37
TC20 execution end time (UTC): 2018 APR 28 03:25:47
SO start time (UTC): 2018 APR 28 02:33:47
SO end time (UTC): 2018 APR 28 03:25:47
UVIS start time (UTC): 2018 APR 28 02:43:47
UVIS end time (UTC): 2018 APR 28 03:25:47
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 640
SO_START_SCIENCE_2 = 900
SO_DURATION_REFERENCE_1 = 30
SO_DURATION_REFERENCE_2 = 30
SO_DURATION_TIME = 3120
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 5
SO_COP_SCIENCE_2 = 5
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 610
UVIS_DURATION_TIME = 2520
UVIS_COP_ROW = 323
CHECKSUM = 865
-------------------------------------------------------------------------------------------------------------


SO: Detector window stepping: 1 step(s) covering detector lines 116 to 140 (1 step(s) per 1 second(s))
UVIS: SO: Full Frame (140:205;0:1047),Tint = 30 ms,16 bit,Rhythm = 3361 ms, Binning=0

Solar line scan with SO and UVIS channel(s) in orbit nr. 2068
Solar line scan with SO and UVIS channel(s) on dayside nr. 240
Solar line scan with SO and UVIS channel(s) nr. 2
Solar line scan with SO and UVIS channel(s) in thermal orbit nr. 240 with orbit type nr. 3
TC20 execution start time (UTC): 2018 MAY 11 08:46:25
TC20 execution end time (UTC): 2018 MAY 11 09:40:35
SO start time (UTC): 2018 MAY 11 08:46:35
SO end time (UTC): 2018 MAY 11 09:40:35
UVIS start time (UTC): 2018 MAY 11 08:56:35
UVIS end time (UTC): 2018 MAY 11 09:40:35
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 640
SO_START_SCIENCE_2 = 900
SO_DURATION_REFERENCE_1 = 30
SO_DURATION_REFERENCE_2 = 30
SO_DURATION_TIME = 3240
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 5
SO_COP_SCIENCE_2 = 5
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 610
UVIS_DURATION_TIME = 2640
UVIS_COP_ROW = 21
CHECKSUM = 803
-------------------------------------------------------------------------------------------------------------


SO: Detector window stepping: 1 step(s) covering detector lines 116 to 140 (1 step(s) per 1 second(s))
UVIS: SO: Vertical Bin (169:176;0:1047),Tint = 40 ms,20 bit,Rhythm = 334 ms, Binning=0

Solar line scan with SO and UVIS channel(s) in orbit nr. 2209
Solar line scan with SO and UVIS channel(s) on dayside nr. 40
Solar line scan with SO and UVIS channel(s) nr. 1
Solar line scan with SO and UVIS channel(s) in thermal orbit nr. 40 with orbit type nr. 4
TC20 execution start time (UTC): 2018 MAY 22 22:11:48
TC20 execution end time (UTC): 2018 MAY 22 23:03:58
SO start time (UTC): 2018 MAY 22 22:11:58
SO end time (UTC): 2018 MAY 22 23:03:58
UVIS start time (UTC): 2018 MAY 22 22:21:58
UVIS end time (UTC): 2018 MAY 22 23:03:58
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 640
SO_START_SCIENCE_2 = 900
SO_DURATION_REFERENCE_1 = 30
SO_DURATION_REFERENCE_2 = 30
SO_DURATION_TIME = 3120
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 5
SO_COP_SCIENCE_2 = 5
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 610
UVIS_DURATION_TIME = 2520
UVIS_COP_ROW = 323
CHECKSUM = 865
-------------------------------------------------------------------------------------------------------------


LNO: Detector window stepping: 1 step(s) covering detector lines 128 to 152 (1 step(s) per 1 second(s))
UVIS: SO: Full Frame (140:205;0:1047),Tint = 45 ms,16 bit,Rhythm = 3361 ms, Binning=0

Calibration : Solar line scan with LNO and UVIS channel(s) in orbit nr. 2541
Calibration : Solar line scan with LNO and UVIS channel(s) on dayside nr. 31
Calibration : Solar line scan with LNO and UVIS channel(s) nr. 1
Calibration : Solar line scan with LNO and UVIS channel(s) in thermal orbit nr. 31 with orbit type nr. 17
TC20 execution start time (UTC): 2018 JUN 19 02:06:59
TC20 execution end time (UTC): 2018 JUN 19 03:01:09
LNO start time (UTC): 2018 JUN 19 02:07:09
LNO end time (UTC): 2018 JUN 19 03:01:09
UVIS start time (UTC): 2018 JUN 19 02:17:09
UVIS end time (UTC): 2018 JUN 19 03:01:09
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 640
LNO_START_SCIENCE_2 = 900
LNO_DURATION_REFERENCE_1 = 30
LNO_DURATION_REFERENCE_2 = 30
LNO_DURATION_TIME = 3240
LNO_COP_GENERAL = 92
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 5
LNO_COP_SCIENCE_2 = 5
UVIS_START_TIME = 610
UVIS_DURATION_TIME = 2640
UVIS_COP_ROW = 301
CHECKSUM = 918
-------------------------------------------------------------------------------------------------------------


SO: Diffraction order stepping (fullscan): 115 orders from 110 to 225 in steps of 1 (1 order(s) per 1 second(s))
UVIS: SO: Full Frame (140:205;0:1047),Tint = 45 ms,16 bit,Rhythm = 3361 ms, Binning=0

Calibration : Full scan with SO and UVIS channel(s) in orbit nr. 2705
Calibration : Full scan with SO and UVIS channel(s) on dayside nr. 194
Calibration : Full scan with SO and UVIS channel(s) nr. 2
Calibration : Full scan with SO and UVIS channel(s) in thermal orbit nr. 194 with orbit type nr. 17
TC20 execution start time (UTC): 2018 JUL 02 10:48:45
TC20 execution end time (UTC): 2018 JUL 02 11:23:55
SO start time (UTC): 2018 JUL 02 10:48:55
SO end time (UTC): 2018 JUL 02 11:23:55
UVIS start time (UTC): 2018 JUL 02 10:58:55
UVIS end time (UTC): 2018 JUL 02 11:23:55
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 640
SO_START_SCIENCE_2 = 900
SO_DURATION_REFERENCE_1 = 30
SO_DURATION_REFERENCE_2 = 30
SO_DURATION_TIME = 2100
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 107
SO_COP_SCIENCE_2 = 107
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 610
UVIS_DURATION_TIME = 1500
UVIS_COP_ROW = 301
CHECKSUM = 1047
-------------------------------------------------------------------------------------------------------------


LNO: Diffraction order stepping (fullscan): 105 orders from 110 to 215 in steps of 1 (1 order(s) per 1 second(s))
UVIS: SO: Full Frame (140:205;0:1047),Tint = 100 ms,16 bit,Rhythm = 3361 ms, Binning=0

Calibration : Full scan with LNO and UVIS channel(s) in orbit nr. 2705
Calibration : Full scan with LNO and UVIS channel(s) on nightside nr. 195
Calibration : Full scan with LNO and UVIS channel(s) nr. 3
Calibration : Full scan with LNO and UVIS channel(s) in thermal orbit nr. 195 with orbit type nr. 17
TC20 execution start time (UTC): 2018 JUL 02 11:24:05
TC20 execution end time (UTC): 2018 JUL 02 11:59:15
LNO start time (UTC): 2018 JUL 02 11:24:15
LNO end time (UTC): 2018 JUL 02 11:59:15
UVIS start time (UTC): 2018 JUL 02 11:34:15
UVIS end time (UTC): 2018 JUL 02 11:59:15
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 640
LNO_START_SCIENCE_2 = 900
LNO_DURATION_REFERENCE_1 = 30
LNO_DURATION_REFERENCE_2 = 30
LNO_DURATION_TIME = 2100
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 57
LNO_COP_SCIENCE_2 = 57
UVIS_START_TIME = 610
UVIS_DURATION_TIME = 1500
UVIS_COP_ROW = 310
CHECKSUM = 956
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 15657 to 16677kHz in steps of 4kHz (1 step(s) per 1 second(s))
SO: AOTF frequency stepping (miniscan): 255 frequencies from 22674 to 23694kHz in steps of 4kHz (1 step(s) per 1 second(s))
UVIS: SO: Full Frame (140:205;0:1047),Tint = 45 ms,16 bit,Rhythm = 3361 ms, Binning=0

Calibration : Mini-scan (#1 with SO alone,#2 with SO+UVIS) with SO and UVIS channel(s) in orbit nr. 2870
Calibration : Mini-scan (#1 with SO alone,#2 with SO+UVIS) with SO and UVIS channel(s) on dayside nr. 17
Calibration : Mini-scan (#1 with SO alone,#2 with SO+UVIS) with SO and UVIS channel(s) nr. 1+2
Calibration : Mini-scan (#1 with SO alone,#2 with SO+UVIS) with SO and UVIS channel(s) in thermal orbit nr. 17 with orbit type nr. 17
TC20 execution start time (UTC): 2018 JUL 15 23:21:21
TC20 execution end time (UTC): 2018 JUL 16 00:07:01
SO start time (UTC): 2018 JUL 15 23:21:31
SO end time (UTC): 2018 JUL 16 00:07:01
UVIS start time (UTC): 2018 JUL 15 23:49:16
UVIS end time (UTC): 2018 JUL 16 00:07:01
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 640
SO_START_SCIENCE_2 = 1675
SO_DURATION_REFERENCE_1 = 30
SO_DURATION_REFERENCE_2 = 30
SO_DURATION_TIME = 2730
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 386
SO_COP_SCIENCE_2 = 418
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 1675
UVIS_DURATION_TIME = 1065
UVIS_COP_ROW = 301
CHECKSUM = 1122
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 25719 to 26739kHz in steps of 4kHz (1 step(s) per 1 second(s))

Calibration : Mini-scan with SO channel(s) in orbit nr. 2870
Calibration : Mini-scan with SO channel(s) on dayside nr. 17
Calibration : Mini-scan with SO channel(s) nr. 3
Calibration : Mini-scan with SO channel(s) in thermal orbit nr. 17 with orbit type nr. 17
TC20 execution start time (UTC): 2018 JUL 16 00:07:06
TC20 execution end time (UTC): 2018 JUL 16 00:31:31
SO start time (UTC): 2018 JUL 16 00:07:16
SO end time (UTC): 2018 JUL 16 00:31:31
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 400
SO_START_SCIENCE_2 = 900
SO_DURATION_REFERENCE_1 = 30
SO_DURATION_REFERENCE_2 = 30
SO_DURATION_TIME = 1455
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 432
SO_COP_SCIENCE_2 = 432
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 0
UVIS_DURATION_TIME = 0
UVIS_COP_ROW = 0
CHECKSUM = 951
-------------------------------------------------------------------------------------------------------------


SO: Detector window stepping: 1 step(s) covering detector lines 104 to 128 (1 step(s) per 1 second(s))
UVIS: SO: Full Frame (140:205;0:1047),Tint = 45 ms,16 bit,Rhythm = 3361 ms, Binning=0

Calibration : Solar line scan with SO and UVIS channel(s) in orbit nr. 3320
Calibration : Solar line scan with SO and UVIS channel(s) on dayside nr. 125
Calibration : Solar line scan with SO and UVIS channel(s) nr. 1
Calibration : Solar line scan with SO and UVIS channel(s) in thermal orbit nr. 125 with orbit type nr. 4
TC20 execution start time (UTC): 2018 AUG 21 19:32:50
TC20 execution end time (UTC): 2018 AUG 21 20:27:00
SO start time (UTC): 2018 AUG 21 19:33:00
SO end time (UTC): 2018 AUG 21 20:27:00
UVIS start time (UTC): 2018 AUG 21 19:43:00
UVIS end time (UTC): 2018 AUG 21 20:27:00
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 640
SO_START_SCIENCE_2 = 900
SO_DURATION_REFERENCE_1 = 30
SO_DURATION_REFERENCE_2 = 30
SO_DURATION_TIME = 3240
SO_COP_GENERAL = 75
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 5
SO_COP_SCIENCE_2 = 5
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 610
UVIS_DURATION_TIME = 2640
UVIS_COP_ROW = 301
CHECKSUM = 901
-------------------------------------------------------------------------------------------------------------


SO: Detector window stepping: 1 step(s) covering detector lines 104 to 128 (1 step(s) per 1 second(s))
UVIS: SO: Full Frame (140:205;0:1047),Tint = 45 ms,16 bit,Rhythm = 3361 ms, Binning=0

Calibration : Solar line scan with SO and UVIS channel(s) in orbit nr. 3407
Calibration : Solar line scan with SO and UVIS channel(s) on dayside nr. 212
Calibration : Solar line scan with SO and UVIS channel(s) nr. 2
Calibration : Solar line scan with SO and UVIS channel(s) in thermal orbit nr. 212 with orbit type nr. 8
TC20 execution start time (UTC): 2018 AUG 28 22:38:50
TC20 execution end time (UTC): 2018 AUG 28 23:33:00
SO start time (UTC): 2018 AUG 28 22:39:00
SO end time (UTC): 2018 AUG 28 23:33:00
UVIS start time (UTC): 2018 AUG 28 22:49:00
UVIS end time (UTC): 2018 AUG 28 23:33:00
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 640
SO_START_SCIENCE_2 = 900
SO_DURATION_REFERENCE_1 = 30
SO_DURATION_REFERENCE_2 = 30
SO_DURATION_TIME = 3240
SO_COP_GENERAL = 75
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 5
SO_COP_SCIENCE_2 = 5
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 610
UVIS_DURATION_TIME = 2640
UVIS_COP_ROW = 301
CHECKSUM = 901
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 16598 to 17108kHz in steps of 2kHz (1 step(s) per 1 second(s))
LNO: AOTF frequency stepping (miniscan): 255 frequencies from 24026 to 24536kHz in steps of 2kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (47:240;0:1047),Tint = 10000 ms,16 bit,Rhythm = 12070 ms, Binning=0

Calibration : Mini-scan (#1+#2 with LNO+UVIS) with LNO and UVIS channel(s) in orbit nr. 3583
Calibration : Mini-scan (#1+#2 with LNO+UVIS) with LNO and UVIS channel(s) on dayside nr. 46
Calibration : Mini-scan (#1+#2 with LNO+UVIS) with LNO and UVIS channel(s) nr. 1+2
Calibration : Mini-scan (#1+#2 with LNO+UVIS) with LNO and UVIS channel(s) in thermal orbit nr. 46 with orbit type nr. 17
TC20 execution start time (UTC): 2018 SEP 12 08:25:50
TC20 execution end time (UTC): 2018 SEP 12 09:08:50
LNO start time (UTC): 2018 SEP 12 08:26:00
LNO end time (UTC): 2018 SEP 12 09:08:50
UVIS start time (UTC): 2018 SEP 12 08:26:00
UVIS end time (UTC): 2018 SEP 12 09:08:50
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 640
LNO_START_SCIENCE_2 = 1595
LNO_DURATION_REFERENCE_1 = 30
LNO_DURATION_REFERENCE_2 = 30
LNO_DURATION_TIME = 2570
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 343
LNO_COP_SCIENCE_2 = 375
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2570
UVIS_COP_ROW = 52
CHECKSUM = 642
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 27256 to 27766kHz in steps of 2kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (47:240;0:1047),Tint = 10000 ms,16 bit,Rhythm = 12070 ms, Binning=0

Calibration : Mini-scan (#3 with LNO+UVIS) with LNO and UVIS channel(s) in orbit nr. 3583
Calibration : Mini-scan (#3 with LNO+UVIS) with LNO and UVIS channel(s) on dayside nr. 46
Calibration : Mini-scan (#3 with LNO+UVIS) with LNO and UVIS channel(s) nr. 3
Calibration : Mini-scan (#3 with LNO+UVIS) with LNO and UVIS channel(s) in thermal orbit nr. 46 with orbit type nr. 17
TC20 execution start time (UTC): 2018 SEP 12 09:08:55
TC20 execution end time (UTC): 2018 SEP 12 09:36:00
LNO start time (UTC): 2018 SEP 12 09:09:05
LNO end time (UTC): 2018 SEP 12 09:36:00
UVIS start time (UTC): 2018 SEP 12 09:09:05
UVIS end time (UTC): 2018 SEP 12 09:36:00
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 640
LNO_START_SCIENCE_2 = 900
LNO_DURATION_REFERENCE_1 = 30
LNO_DURATION_REFERENCE_2 = 30
LNO_DURATION_TIME = 1615
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 389
LNO_COP_SCIENCE_2 = 389
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 1615
UVIS_COP_ROW = 52
CHECKSUM = 902
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 17859 to 18369kHz in steps of 2kHz (1 step(s) per 1 second(s))
SO: AOTF frequency stepping (miniscan): 255 frequencies from 22238 to 22748kHz in steps of 2kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (47:240;0:1047),Tint = 10000 ms,16 bit,Rhythm = 12070 ms, Binning=0

Calibration : Mini-scan (#4+#5 with SO+UVIS) with SO and UVIS channel(s) in orbit nr. 3761
Calibration : Mini-scan (#4+#5 with SO+UVIS) with SO and UVIS channel(s) on dayside nr. 224
Calibration : Mini-scan (#4+#5 with SO+UVIS) with SO and UVIS channel(s) nr. 4+5
Calibration : Mini-scan (#4+#5 with SO+UVIS) with SO and UVIS channel(s) in thermal orbit nr. 224 with orbit type nr. 4
TC20 execution start time (UTC): 2018 SEP 26 22:05:50
TC20 execution end time (UTC): 2018 SEP 26 22:48:50
SO start time (UTC): 2018 SEP 26 22:06:00
SO end time (UTC): 2018 SEP 26 22:48:50
UVIS start time (UTC): 2018 SEP 26 22:06:00
UVIS end time (UTC): 2018 SEP 26 22:48:50
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 640
SO_START_SCIENCE_2 = 1595
SO_DURATION_REFERENCE_1 = 30
SO_DURATION_REFERENCE_2 = 30
SO_DURATION_TIME = 2570
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 320
SO_COP_SCIENCE_2 = 340
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2570
UVIS_COP_ROW = 52
CHECKSUM = 584
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 25285 to 25795kHz in steps of 2kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (47:240;0:1047),Tint = 10000 ms,16 bit,Rhythm = 12070 ms, Binning=0

Calibration : Mini-scan (#6 with SO+UVIS) with SO and UVIS channel(s) in orbit nr. 3761
Calibration : Mini-scan (#6 with SO+UVIS) with SO and UVIS channel(s) on dayside nr. 224
Calibration : Mini-scan (#6 with SO+UVIS) with SO and UVIS channel(s) nr. 6
Calibration : Mini-scan (#6 with SO+UVIS) with SO and UVIS channel(s) in thermal orbit nr. 224 with orbit type nr. 4
TC20 execution start time (UTC): 2018 SEP 26 22:48:55
TC20 execution end time (UTC): 2018 SEP 26 23:16:00
SO start time (UTC): 2018 SEP 26 22:49:05
SO end time (UTC): 2018 SEP 26 23:16:00
UVIS start time (UTC): 2018 SEP 26 22:49:05
UVIS end time (UTC): 2018 SEP 26 23:16:00
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 640
SO_START_SCIENCE_2 = 900
SO_DURATION_REFERENCE_1 = 30
SO_DURATION_REFERENCE_2 = 30
SO_DURATION_TIME = 1615
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 354
SO_COP_SCIENCE_2 = 354
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 1615
UVIS_COP_ROW = 52
CHECKSUM = 832
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 18927 to 19437kHz in steps of 2kHz (1 step(s) per 1 second(s))
LNO: AOTF frequency stepping (miniscan): 255 frequencies from 23564 to 24074kHz in steps of 2kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (47:240;0:1047),Tint = 10000 ms,16 bit,Rhythm = 12070 ms, Binning=0

Calibration : Mini-scan (#7+#8 with LNO+UVIS) with LNO and UVIS channel(s) in orbit nr. 3874
Calibration : Mini-scan (#7+#8 with LNO+UVIS) with LNO and UVIS channel(s) on dayside nr. 337
Calibration : Mini-scan (#7+#8 with LNO+UVIS) with LNO and UVIS channel(s) nr. 7+8
Calibration : Mini-scan (#7+#8 with LNO+UVIS) with LNO and UVIS channel(s) in thermal orbit nr. 337 with orbit type nr. 4
TC20 execution start time (UTC): 2018 OCT 06 04:02:50
TC20 execution end time (UTC): 2018 OCT 06 04:45:50
LNO start time (UTC): 2018 OCT 06 04:03:00
LNO end time (UTC): 2018 OCT 06 04:45:50
UVIS start time (UTC): 2018 OCT 06 04:03:00
UVIS end time (UTC): 2018 OCT 06 04:45:50
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 640
LNO_START_SCIENCE_2 = 1595
LNO_DURATION_REFERENCE_1 = 30
LNO_DURATION_REFERENCE_2 = 30
LNO_DURATION_TIME = 2570
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 353
LNO_COP_SCIENCE_2 = 373
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2570
UVIS_COP_ROW = 52
CHECKSUM = 650
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 26795 to 27305kHz in steps of 2kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (47:240;0:1047),Tint = 10000 ms,16 bit,Rhythm = 12070 ms, Binning=0

Calibration : Mini-scan (#9 with LNO+UVIS) with LNO and UVIS channel(s) in orbit nr. 3874
Calibration : Mini-scan (#9 with LNO+UVIS) with LNO and UVIS channel(s) on dayside nr. 337
Calibration : Mini-scan (#9 with LNO+UVIS) with LNO and UVIS channel(s) nr. 9
Calibration : Mini-scan (#9 with LNO+UVIS) with LNO and UVIS channel(s) in thermal orbit nr. 337 with orbit type nr. 4
TC20 execution start time (UTC): 2018 OCT 06 04:45:55
TC20 execution end time (UTC): 2018 OCT 06 05:13:00
LNO start time (UTC): 2018 OCT 06 04:46:05
LNO end time (UTC): 2018 OCT 06 05:13:00
UVIS start time (UTC): 2018 OCT 06 04:46:05
UVIS end time (UTC): 2018 OCT 06 05:13:00
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 640
LNO_START_SCIENCE_2 = 900
LNO_DURATION_REFERENCE_1 = 30
LNO_DURATION_REFERENCE_2 = 30
LNO_DURATION_TIME = 1615
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 387
LNO_COP_SCIENCE_2 = 387
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 1615
UVIS_COP_ROW = 52
CHECKSUM = 898
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 16539 to 17559kHz in steps of 4kHz (1 step(s) per 1 second(s))
SO: AOTF frequency stepping (miniscan): 255 frequencies from 18737 to 19757kHz in steps of 4kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 7000 ms,16 bit,Rhythm = 20148 ms, Binning=0

Calibration : Mini-scan (#1+#2 with SO+UVIS) with SO and UVIS channel(s) in orbit nr. 3925
Calibration : Mini-scan (#1+#2 with SO+UVIS) with SO and UVIS channel(s) on dayside nr. 46
Calibration : Mini-scan (#1+#2 with SO+UVIS) with SO and UVIS channel(s) nr. 1+2
Calibration : Mini-scan (#1+#2 with SO+UVIS) with SO and UVIS channel(s) in thermal orbit nr. 46 with orbit type nr. 4
TC20 execution start time (UTC): 2018 OCT 10 08:08:50
TC20 execution end time (UTC): 2018 OCT 10 08:43:52
SO start time (UTC): 2018 OCT 10 08:09:00
SO end time (UTC): 2018 OCT 10 08:43:52
UVIS start time (UTC): 2018 OCT 10 08:09:00
UVIS end time (UTC): 2018 OCT 10 08:43:52
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 390
SO_COP_SCIENCE_2 = 400
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 78
CHECKSUM = 730
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 22674 to 23694kHz in steps of 4kHz (1 step(s) per 1 second(s))
SO: AOTF frequency stepping (miniscan): 255 frequencies from 26586 to 27606kHz in steps of 4kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 7000 ms,16 bit,Rhythm = 20148 ms, Binning=0

Calibration : Mini-scan (#3+#4 with SO+UVIS) with SO and UVIS channel(s) in orbit nr. 3925
Calibration : Mini-scan (#3+#4 with SO+UVIS) with SO and UVIS channel(s) on dayside nr. 46
Calibration : Mini-scan (#3+#4 with SO+UVIS) with SO and UVIS channel(s) nr. 3+4
Calibration : Mini-scan (#3+#4 with SO+UVIS) with SO and UVIS channel(s) in thermal orbit nr. 46 with orbit type nr. 4
TC20 execution start time (UTC): 2018 OCT 10 08:43:57
TC20 execution end time (UTC): 2018 OCT 10 09:18:59
SO start time (UTC): 2018 OCT 10 08:44:07
SO end time (UTC): 2018 OCT 10 09:18:59
UVIS start time (UTC): 2018 OCT 10 08:44:07
UVIS end time (UTC): 2018 OCT 10 09:18:59
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 418
SO_COP_SCIENCE_2 = 436
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 78
CHECKSUM = 794
-------------------------------------------------------------------------------------------------------------


SO: Diffraction order stepping (fullscan): 115 orders from 110 to 225 in steps of 1 (1 order(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 7000 ms,16 bit,Rhythm = 20148 ms, Binning=0

Calibration : Full-scan (#1+#2 with SO+UVIS) with SO and UVIS channel(s) in orbit nr. 3990
Calibration : Full-scan (#1+#2 with SO+UVIS) with SO and UVIS channel(s) on dayside nr. 111
Calibration : Full-scan (#1+#2 with SO+UVIS) with SO and UVIS channel(s) nr. 1+2
Calibration : Full-scan (#1+#2 with SO+UVIS) with SO and UVIS channel(s) in thermal orbit nr. 111 with orbit type nr. 3
TC20 execution start time (UTC): 2018 OCT 15 15:25:50
TC20 execution end time (UTC): 2018 OCT 15 16:00:52
SO start time (UTC): 2018 OCT 15 15:26:00
SO end time (UTC): 2018 OCT 15 16:00:52
UVIS start time (UTC): 2018 OCT 15 15:26:00
UVIS end time (UTC): 2018 OCT 15 16:00:52
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 107
SO_COP_SCIENCE_2 = 107
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 78
CHECKSUM = 664
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 18737 to 19247kHz in steps of 2kHz (1 step(s) per 1 second(s))
SO: AOTF frequency stepping (miniscan): 255 frequencies from 22238 to 22748kHz in steps of 2kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 7000 ms,16 bit,Rhythm = 20148 ms, Binning=0

Calibration : Mini-scan (#5+#6 with SO+UVIS) with SO and UVIS channel(s) in orbit nr. 3990
Calibration : Mini-scan (#5+#6 with SO+UVIS) with SO and UVIS channel(s) on dayside nr. 111
Calibration : Mini-scan (#5+#6 with SO+UVIS) with SO and UVIS channel(s) nr. 5+6
Calibration : Mini-scan (#5+#6 with SO+UVIS) with SO and UVIS channel(s) in thermal orbit nr. 111 with orbit type nr. 3
TC20 execution start time (UTC): 2018 OCT 15 16:00:57
TC20 execution end time (UTC): 2018 OCT 15 16:35:59
SO start time (UTC): 2018 OCT 15 16:01:07
SO end time (UTC): 2018 OCT 15 16:35:59
UVIS start time (UTC): 2018 OCT 15 16:01:07
UVIS end time (UTC): 2018 OCT 15 16:35:59
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 324
SO_COP_SCIENCE_2 = 340
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 78
CHECKSUM = 604
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 17530 to 18550kHz in steps of 4kHz (1 step(s) per 1 second(s))
LNO: AOTF frequency stepping (miniscan): 255 frequencies from 19856 to 20876kHz in steps of 4kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 7000 ms,16 bit,Rhythm = 20148 ms, Binning=0

Calibration : Mini-scan (#7+#8 with LNO+UVIS) with LNO and UVIS channel(s) in orbit nr. 4059
Calibration : Mini-scan (#7+#8 with LNO+UVIS) with LNO and UVIS channel(s) on dayside nr. 180
Calibration : Mini-scan (#7+#8 with LNO+UVIS) with LNO and UVIS channel(s) nr. 7+8
Calibration : Mini-scan (#7+#8 with LNO+UVIS) with LNO and UVIS channel(s) in thermal orbit nr. 180 with orbit type nr. 17
TC20 execution start time (UTC): 2018 OCT 21 06:40:50
TC20 execution end time (UTC): 2018 OCT 21 07:15:52
LNO start time (UTC): 2018 OCT 21 06:41:00
LNO end time (UTC): 2018 OCT 21 07:15:52
UVIS start time (UTC): 2018 OCT 21 06:41:00
UVIS end time (UTC): 2018 OCT 21 07:15:52
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 1356
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 2092
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 423
LNO_COP_SCIENCE_2 = 433
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 78
CHECKSUM = 796
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 24026 to 25046kHz in steps of 4kHz (1 step(s) per 1 second(s))
LNO: AOTF frequency stepping (miniscan): 255 frequencies from 28176 to 29196kHz in steps of 4kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 7000 ms,16 bit,Rhythm = 20148 ms, Binning=0

Calibration : Mini-scan (#9+#10 with LNO+UVIS) with LNO and UVIS channel(s) in orbit nr. 4059
Calibration : Mini-scan (#9+#10 with LNO+UVIS) with LNO and UVIS channel(s) on dayside nr. 180
Calibration : Mini-scan (#9+#10 with LNO+UVIS) with LNO and UVIS channel(s) nr. 9+10
Calibration : Mini-scan (#9+#10 with LNO+UVIS) with LNO and UVIS channel(s) in thermal orbit nr. 180 with orbit type nr. 17
TC20 execution start time (UTC): 2018 OCT 21 07:15:57
TC20 execution end time (UTC): 2018 OCT 21 07:50:59
LNO start time (UTC): 2018 OCT 21 07:16:07
LNO end time (UTC): 2018 OCT 21 07:50:59
UVIS start time (UTC): 2018 OCT 21 07:16:07
UVIS end time (UTC): 2018 OCT 21 07:50:59
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 1356
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 2092
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 451
LNO_COP_SCIENCE_2 = 469
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 78
CHECKSUM = 860
-------------------------------------------------------------------------------------------------------------


LNO: Diffraction order stepping (fullscan): 105 orders from 110 to 215 in steps of 1 (1 order(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 7000 ms,16 bit,Rhythm = 20148 ms, Binning=0

Calibration : Full-scan (#3+#4 with LNO+UVIS) with LNO and UVIS channel(s) in orbit nr. 4201
Calibration : Full-scan (#3+#4 with LNO+UVIS) with LNO and UVIS channel(s) on dayside nr. 322
Calibration : Full-scan (#3+#4 with LNO+UVIS) with LNO and UVIS channel(s) nr. 3+4
Calibration : Full-scan (#3+#4 with LNO+UVIS) with LNO and UVIS channel(s) in thermal orbit nr. 322 with orbit type nr. 4
TC20 execution start time (UTC): 2018 NOV 01 21:32:50
TC20 execution end time (UTC): 2018 NOV 01 22:07:52
LNO start time (UTC): 2018 NOV 01 21:33:00
LNO end time (UTC): 2018 NOV 01 22:07:52
UVIS start time (UTC): 2018 NOV 01 21:33:00
UVIS end time (UTC): 2018 NOV 01 22:07:52
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 1356
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 2092
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 57
LNO_COP_SCIENCE_2 = 57
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 78
CHECKSUM = 564
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 19856 to 20366kHz in steps of 2kHz (1 step(s) per 1 second(s))
LNO: AOTF frequency stepping (miniscan): 255 frequencies from 23564 to 24074kHz in steps of 2kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 7000 ms,16 bit,Rhythm = 20148 ms, Binning=0

Calibration : Mini-scan (#11+#12 with LNO+UVIS) with LNO and UVIS channel(s) in orbit nr. 4201
Calibration : Mini-scan (#11+#12 with LNO+UVIS) with LNO and UVIS channel(s) on dayside nr. 322
Calibration : Mini-scan (#11+#12 with LNO+UVIS) with LNO and UVIS channel(s) nr. 11+12
Calibration : Mini-scan (#11+#12 with LNO+UVIS) with LNO and UVIS channel(s) in thermal orbit nr. 322 with orbit type nr. 4
TC20 execution start time (UTC): 2018 NOV 01 22:07:57
TC20 execution end time (UTC): 2018 NOV 01 22:42:59
LNO start time (UTC): 2018 NOV 01 22:08:07
LNO end time (UTC): 2018 NOV 01 22:42:59
UVIS start time (UTC): 2018 NOV 01 22:08:07
UVIS end time (UTC): 2018 NOV 01 22:42:59
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 1356
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 2092
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 357
LNO_COP_SCIENCE_2 = 373
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 78
CHECKSUM = 670
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 20784 to 21804kHz in steps of 4kHz (1 step(s) per 1 second(s))
LNO: AOTF frequency stepping (miniscan): 255 frequencies from 23102 to 24122kHz in steps of 4kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 7000 ms,16 bit,Rhythm = 20148 ms, Binning=0

Calibration : Mini-scan (#1+#2 with LNO+UVIS) with LNO and UVIS channel(s) in orbit nr. 4261
Calibration : Mini-scan (#1+#2 with LNO+UVIS) with LNO and UVIS channel(s) on dayside nr. 40
Calibration : Mini-scan (#1+#2 with LNO+UVIS) with LNO and UVIS channel(s) nr. 1+2
Calibration : Mini-scan (#1+#2 with LNO+UVIS) with LNO and UVIS channel(s) in thermal orbit nr. 40 with orbit type nr. 4
TC20 execution start time (UTC): 2018 NOV 06 19:23:50
TC20 execution end time (UTC): 2018 NOV 06 19:58:52
LNO start time (UTC): 2018 NOV 06 19:24:00
LNO end time (UTC): 2018 NOV 06 19:58:52
UVIS start time (UTC): 2018 NOV 06 19:24:00
UVIS end time (UTC): 2018 NOV 06 19:58:52
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 1356
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 2092
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 437
LNO_COP_SCIENCE_2 = 447
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 78
CHECKSUM = 824
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 24489 to 25509kHz in steps of 4kHz (1 step(s) per 1 second(s))
LNO: AOTF frequency stepping (miniscan): 255 frequencies from 28636 to 29656kHz in steps of 4kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 7000 ms,16 bit,Rhythm = 20148 ms, Binning=0

Calibration : Mini-scan (#3+#4 with LNO+UVIS) with LNO and UVIS channel(s) in orbit nr. 4261
Calibration : Mini-scan (#3+#4 with LNO+UVIS) with LNO and UVIS channel(s) on dayside nr. 40
Calibration : Mini-scan (#3+#4 with LNO+UVIS) with LNO and UVIS channel(s) nr. 3+4
Calibration : Mini-scan (#3+#4 with LNO+UVIS) with LNO and UVIS channel(s) in thermal orbit nr. 40 with orbit type nr. 4
TC20 execution start time (UTC): 2018 NOV 06 19:58:57
TC20 execution end time (UTC): 2018 NOV 06 20:33:59
LNO start time (UTC): 2018 NOV 06 19:59:07
LNO end time (UTC): 2018 NOV 06 20:33:59
UVIS start time (UTC): 2018 NOV 06 19:59:07
UVIS end time (UTC): 2018 NOV 06 20:33:59
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 1356
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 2092
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 453
LNO_COP_SCIENCE_2 = 471
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 78
CHECKSUM = 864
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 19614 to 20634kHz in steps of 4kHz (1 step(s) per 1 second(s))
SO: AOTF frequency stepping (miniscan): 255 frequencies from 21802 to 22822kHz in steps of 4kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 7000 ms,16 bit,Rhythm = 20148 ms, Binning=0

Calibration : Mini-scan (#5+#6 with SO+UVIS) with SO and UVIS channel(s) in orbit nr. 4353
Calibration : Mini-scan (#5+#6 with SO+UVIS) with SO and UVIS channel(s) on dayside nr. 132
Calibration : Mini-scan (#5+#6 with SO+UVIS) with SO and UVIS channel(s) nr. 5+6
Calibration : Mini-scan (#5+#6 with SO+UVIS) with SO and UVIS channel(s) in thermal orbit nr. 132 with orbit type nr. 17
TC20 execution start time (UTC): 2018 NOV 14 08:07:50
TC20 execution end time (UTC): 2018 NOV 14 08:42:52
SO start time (UTC): 2018 NOV 14 08:08:00
SO end time (UTC): 2018 NOV 14 08:42:52
UVIS start time (UTC): 2018 NOV 14 08:08:00
UVIS end time (UTC): 2018 NOV 14 08:42:52
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 404
SO_COP_SCIENCE_2 = 414
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 78
CHECKSUM = 758
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 23110 to 24130kHz in steps of 4kHz (1 step(s) per 1 second(s))
SO: AOTF frequency stepping (miniscan): 255 frequencies from 27019 to 28039kHz in steps of 4kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 7000 ms,16 bit,Rhythm = 20148 ms, Binning=0

Calibration : Mini-scan (#7+#8 with SO+UVIS) with SO and UVIS channel(s) in orbit nr. 4353
Calibration : Mini-scan (#7+#8 with SO+UVIS) with SO and UVIS channel(s) on dayside nr. 132
Calibration : Mini-scan (#7+#8 with SO+UVIS) with SO and UVIS channel(s) nr. 7+8
Calibration : Mini-scan (#7+#8 with SO+UVIS) with SO and UVIS channel(s) in thermal orbit nr. 132 with orbit type nr. 17
TC20 execution start time (UTC): 2018 NOV 14 08:42:57
TC20 execution end time (UTC): 2018 NOV 14 09:17:59
SO start time (UTC): 2018 NOV 14 08:43:07
SO end time (UTC): 2018 NOV 14 09:17:59
UVIS start time (UTC): 2018 NOV 14 08:43:07
UVIS end time (UTC): 2018 NOV 14 09:17:59
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 420
SO_COP_SCIENCE_2 = 438
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 78
CHECKSUM = 798
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 17530 to 18040kHz in steps of 2kHz (1 step(s) per 1 second(s))
LNO: AOTF frequency stepping (miniscan): 255 frequencies from 20784 to 21294kHz in steps of 2kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 7000 ms,16 bit,Rhythm = 20148 ms, Binning=0

Calibration : Mini-scan (#9+#10 with LNO+UVIS) with LNO and UVIS channel(s) in orbit nr. 4441
Calibration : Mini-scan (#9+#10 with LNO+UVIS) with LNO and UVIS channel(s) on dayside nr. 220
Calibration : Mini-scan (#9+#10 with LNO+UVIS) with LNO and UVIS channel(s) nr. 9+10
Calibration : Mini-scan (#9+#10 with LNO+UVIS) with LNO and UVIS channel(s) in thermal orbit nr. 220 with orbit type nr. 4
TC20 execution start time (UTC): 2018 NOV 21 13:02:50
TC20 execution end time (UTC): 2018 NOV 21 13:37:52
LNO start time (UTC): 2018 NOV 21 13:03:00
LNO end time (UTC): 2018 NOV 21 13:37:52
UVIS start time (UTC): 2018 NOV 21 13:03:00
UVIS end time (UTC): 2018 NOV 21 13:37:52
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 1356
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 2092
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 347
LNO_COP_SCIENCE_2 = 361
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 78
CHECKSUM = 648
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 23102 to 23612kHz in steps of 2kHz (1 step(s) per 1 second(s))
LNO: AOTF frequency stepping (miniscan): 255 frequencies from 28176 to 28686kHz in steps of 2kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 7000 ms,16 bit,Rhythm = 20148 ms, Binning=0

Calibration : Mini-scan (#11+#12 with LNO+UVIS) with LNO and UVIS channel(s) in orbit nr. 4441
Calibration : Mini-scan (#11+#12 with LNO+UVIS) with LNO and UVIS channel(s) on dayside nr. 220
Calibration : Mini-scan (#11+#12 with LNO+UVIS) with LNO and UVIS channel(s) nr. 11+12
Calibration : Mini-scan (#11+#12 with LNO+UVIS) with LNO and UVIS channel(s) in thermal orbit nr. 220 with orbit type nr. 4
TC20 execution start time (UTC): 2018 NOV 21 13:37:57
TC20 execution end time (UTC): 2018 NOV 21 14:12:59
LNO start time (UTC): 2018 NOV 21 13:38:07
LNO end time (UTC): 2018 NOV 21 14:12:59
UVIS start time (UTC): 2018 NOV 21 13:38:07
UVIS end time (UTC): 2018 NOV 21 14:12:59
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 1356
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 2092
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 371
LNO_COP_SCIENCE_2 = 393
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 78
CHECKSUM = 704
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 16539 to 17049kHz in steps of 2kHz (1 step(s) per 1 second(s))
SO: AOTF frequency stepping (miniscan): 255 frequencies from 19614 to 20124kHz in steps of 2kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 7000 ms,16 bit,Rhythm = 20148 ms, Binning=0

Calibration : Mini-scan (#13+#14 with SO+UVIS) with SO and UVIS channel(s) in orbit nr. 4532
Calibration : Mini-scan (#13+#14 with SO+UVIS) with SO and UVIS channel(s) on dayside nr. 311
Calibration : Mini-scan (#13+#14 with SO+UVIS) with SO and UVIS channel(s) nr. 13+14
Calibration : Mini-scan (#13+#14 with SO+UVIS) with SO and UVIS channel(s) in thermal orbit nr. 311 with orbit type nr. 17
TC20 execution start time (UTC): 2018 NOV 28 23:53:50
TC20 execution end time (UTC): 2018 NOV 29 00:28:52
SO start time (UTC): 2018 NOV 28 23:54:00
SO end time (UTC): 2018 NOV 29 00:28:52
UVIS start time (UTC): 2018 NOV 28 23:54:00
UVIS end time (UTC): 2018 NOV 29 00:28:52
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 314
SO_COP_SCIENCE_2 = 328
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 78
CHECKSUM = 582
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 21802 to 22312kHz in steps of 2kHz (1 step(s) per 1 second(s))
SO: AOTF frequency stepping (miniscan): 255 frequencies from 26586 to 27096kHz in steps of 2kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 7000 ms,16 bit,Rhythm = 20148 ms, Binning=0

Calibration : Mini-scan (#15+#16 with SO+UVIS) with SO and UVIS channel(s) in orbit nr. 4532
Calibration : Mini-scan (#15+#16 with SO+UVIS) with SO and UVIS channel(s) on dayside nr. 311
Calibration : Mini-scan (#15+#16 with SO+UVIS) with SO and UVIS channel(s) nr. 15+16
Calibration : Mini-scan (#15+#16 with SO+UVIS) with SO and UVIS channel(s) in thermal orbit nr. 311 with orbit type nr. 17
TC20 execution start time (UTC): 2018 NOV 29 00:28:57
TC20 execution end time (UTC): 2018 NOV 29 01:03:59
SO start time (UTC): 2018 NOV 29 00:29:07
SO end time (UTC): 2018 NOV 29 01:03:59
UVIS start time (UTC): 2018 NOV 29 00:29:07
UVIS end time (UTC): 2018 NOV 29 01:03:59
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 338
SO_COP_SCIENCE_2 = 360
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 78
CHECKSUM = 638
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 16098 to 17118kHz in steps of 4kHz (1 step(s) per 1 second(s))
SO: AOTF frequency stepping (miniscan): 255 frequencies from 18298 to 19318kHz in steps of 4kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 7000 ms,16 bit,Rhythm = 20148 ms, Binning=0

Calibration : Mini-scan (#1+#2 with SO+UVIS) with SO and UVIS channel(s) in orbit nr. 4626
Calibration : Mini-scan (#1+#2 with SO+UVIS) with SO and UVIS channel(s) on dayside nr. 63
Calibration : Mini-scan (#1+#2 with SO+UVIS) with SO and UVIS channel(s) nr. 1+2
Calibration : Mini-scan (#1+#2 with SO+UVIS) with SO and UVIS channel(s) in thermal orbit nr. 63 with orbit type nr. 4
TC20 execution start time (UTC): 2018 DEC 06 16:43:50
TC20 execution end time (UTC): 2018 DEC 06 17:18:52
SO start time (UTC): 2018 DEC 06 16:44:00
SO end time (UTC): 2018 DEC 06 17:18:52
UVIS start time (UTC): 2018 DEC 06 16:44:00
UVIS end time (UTC): 2018 DEC 06 17:18:52
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 388
SO_COP_SCIENCE_2 = 398
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 78
CHECKSUM = 726
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 21365 to 22385kHz in steps of 4kHz (1 step(s) per 1 second(s))
SO: AOTF frequency stepping (miniscan): 255 frequencies from 26153 to 27173kHz in steps of 4kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 7000 ms,16 bit,Rhythm = 20148 ms, Binning=0

Calibration : Mini-scan (#3+#4 with SO+UVIS) with SO and UVIS channel(s) in orbit nr. 4626
Calibration : Mini-scan (#3+#4 with SO+UVIS) with SO and UVIS channel(s) on dayside nr. 63
Calibration : Mini-scan (#3+#4 with SO+UVIS) with SO and UVIS channel(s) nr. 3+4
Calibration : Mini-scan (#3+#4 with SO+UVIS) with SO and UVIS channel(s) in thermal orbit nr. 63 with orbit type nr. 4
TC20 execution start time (UTC): 2018 DEC 06 17:18:57
TC20 execution end time (UTC): 2018 DEC 06 17:53:59
SO start time (UTC): 2018 DEC 06 17:19:07
SO end time (UTC): 2018 DEC 06 17:53:59
UVIS start time (UTC): 2018 DEC 06 17:19:07
UVIS end time (UTC): 2018 DEC 06 17:53:59
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 412
SO_COP_SCIENCE_2 = 434
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 78
CHECKSUM = 786
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 17064 to 18084kHz in steps of 4kHz (1 step(s) per 1 second(s))
LNO: AOTF frequency stepping (miniscan): 255 frequencies from 19391 to 20411kHz in steps of 4kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 7000 ms,16 bit,Rhythm = 20148 ms, Binning=0

Calibration : Mini-scan (#5+#6 with LNO+UVIS) with LNO and UVIS channel(s) in orbit nr. 4663
Calibration : Mini-scan (#5+#6 with LNO+UVIS) with LNO and UVIS channel(s) on dayside nr. 100
Calibration : Mini-scan (#5+#6 with LNO+UVIS) with LNO and UVIS channel(s) nr. 5+6
Calibration : Mini-scan (#5+#6 with LNO+UVIS) with LNO and UVIS channel(s) in thermal orbit nr. 100 with orbit type nr. 4
TC20 execution start time (UTC): 2018 DEC 09 17:28:50
TC20 execution end time (UTC): 2018 DEC 09 18:03:52
LNO start time (UTC): 2018 DEC 09 17:29:00
LNO end time (UTC): 2018 DEC 09 18:03:52
UVIS start time (UTC): 2018 DEC 09 17:29:00
UVIS end time (UTC): 2018 DEC 09 18:03:52
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 1356
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 2092
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 421
LNO_COP_SCIENCE_2 = 431
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 78
CHECKSUM = 792
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 22639 to 23659kHz in steps of 4kHz (1 step(s) per 1 second(s))
LNO: AOTF frequency stepping (miniscan): 255 frequencies from 27716 to 28736kHz in steps of 4kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 7000 ms,16 bit,Rhythm = 20148 ms, Binning=0

Calibration : Mini-scan (#7+#8 with LNO+UVIS) with LNO and UVIS channel(s) in orbit nr. 4663
Calibration : Mini-scan (#7+#8 with LNO+UVIS) with LNO and UVIS channel(s) on dayside nr. 100
Calibration : Mini-scan (#7+#8 with LNO+UVIS) with LNO and UVIS channel(s) nr. 7+8
Calibration : Mini-scan (#7+#8 with LNO+UVIS) with LNO and UVIS channel(s) in thermal orbit nr. 100 with orbit type nr. 4
TC20 execution start time (UTC): 2018 DEC 09 18:03:57
TC20 execution end time (UTC): 2018 DEC 09 18:38:59
LNO start time (UTC): 2018 DEC 09 18:04:07
LNO end time (UTC): 2018 DEC 09 18:38:59
UVIS start time (UTC): 2018 DEC 09 18:04:07
UVIS end time (UTC): 2018 DEC 09 18:38:59
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 1356
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 2092
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 445
LNO_COP_SCIENCE_2 = 467
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 78
CHECKSUM = 852
-------------------------------------------------------------------------------------------------------------


SO: Science: orders #164, #164, #164, #164, #164, #164, with 4000us integration time (6 orders per 1 second(s) for detector lines 120 to 136)
UVIS: SO: Horizontal Bin (140:205;0:1047), Tint = 45 ms,20 bit,Rhythm = 1057 ms, Binning=7

Calibration : Solar line scan (#1 with SO+UVIS) with SO and UVIS channel(s) in orbit nr. 4781
Calibration : Solar line scan (#1 with SO+UVIS) with SO and UVIS channel(s) on dayside nr. 218
Calibration : Solar line scan (#1 with SO+UVIS) with SO and UVIS channel(s) nr. 1
Calibration : Solar line scan (#1 with SO+UVIS) with SO and UVIS channel(s) in thermal orbit nr. 218 with orbit type nr. 3
TC20 execution start time (UTC): 2018 DEC 19 09:17:50
TC20 execution end time (UTC): 2018 DEC 19 10:12:00
SO start time (UTC): 2018 DEC 19 09:18:00
SO end time (UTC): 2018 DEC 19 10:12:00
UVIS start time (UTC): 2018 DEC 19 09:28:00
UVIS end time (UTC): 2018 DEC 19 10:12:00
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 3240
SO_COP_GENERAL = 1
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 3973
SO_COP_SCIENCE_2 = 3973
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 610
UVIS_DURATION_TIME = 2640
UVIS_COP_ROW = 317
CHECKSUM = 985
-------------------------------------------------------------------------------------------------------------


SO: Science: orders #164, #164, #164, #164, #164, #164, with 4000us integration time (6 orders per 1 second(s) for detector lines 120 to 136)
UVIS: SO: Horizontal Bin (140:205;0:1047), Tint = 45 ms,20 bit,Rhythm = 1057 ms, Binning=7

Calibration : Solar line scan (#2 with SO+UVIS) with SO and UVIS channel(s) in orbit nr. 4851
Calibration : Solar line scan (#2 with SO+UVIS) with SO and UVIS channel(s) on dayside nr. 288
Calibration : Solar line scan (#2 with SO+UVIS) with SO and UVIS channel(s) nr. 2
Calibration : Solar line scan (#2 with SO+UVIS) with SO and UVIS channel(s) in thermal orbit nr. 288 with orbit type nr. 4
TC20 execution start time (UTC): 2018 DEC 25 02:51:50
TC20 execution end time (UTC): 2018 DEC 25 03:46:00
SO start time (UTC): 2018 DEC 25 02:52:00
SO end time (UTC): 2018 DEC 25 03:46:00
UVIS start time (UTC): 2018 DEC 25 03:02:00
UVIS end time (UTC): 2018 DEC 25 03:46:00
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 3240
SO_COP_GENERAL = 1
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 3973
SO_COP_SCIENCE_2 = 3973
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 610
UVIS_DURATION_TIME = 2640
UVIS_COP_ROW = 317
CHECKSUM = 985
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 16098 to 18138kHz in steps of 8kHz (1 step(s) per 1 second(s))
SO: AOTF frequency stepping (miniscan): 255 frequencies from 18737 to 20777kHz in steps of 8kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Horizontal Bin (57:240;0:1047), Tint = 7500 ms,20 bit,Rhythm = 10494 ms, Binning=7

Calibration : Mini-scan #1+#2 with SO and UVIS channel(s) in orbit nr. 5009
Calibration : Mini-scan #1+#2 with SO and UVIS channel(s) on dayside nr. 104
Calibration : Mini-scan #1+#2 with SO and UVIS channel(s) nr. 1+2
Calibration : Mini-scan #1+#2 with SO and UVIS channel(s) in thermal orbit nr. 104 with orbit type nr. 17
TC20 execution start time (UTC): 2019 JAN 07 01:21:40
TC20 execution end time (UTC): 2019 JAN 07 01:56:42
SO start time (UTC): 2019 JAN 07 01:21:50
SO end time (UTC): 2019 JAN 07 01:56:42
UVIS start time (UTC): 2019 JAN 07 01:21:50
UVIS end time (UTC): 2019 JAN 07 01:56:42
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 404
SO_COP_SCIENCE_2 = 407
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 162
CHECKSUM = 835
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 21365 to 23405kHz in steps of 8kHz (1 step(s) per 1 second(s))
SO: AOTF frequency stepping (miniscan): 255 frequencies from 26586 to 28626kHz in steps of 8kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Horizontal Bin (57:240;0:1047), Tint = 7500 ms,20 bit,Rhythm = 10494 ms, Binning=7

Calibration : Mini-scan #3+#4 with SO and UVIS channel(s) in orbit nr. 5009
Calibration : Mini-scan #3+#4 with SO and UVIS channel(s) on dayside nr. 104
Calibration : Mini-scan #3+#4 with SO and UVIS channel(s) nr. 3+4
Calibration : Mini-scan #3+#4 with SO and UVIS channel(s) in thermal orbit nr. 104 with orbit type nr. 17
TC20 execution start time (UTC): 2019 JAN 07 01:56:47
TC20 execution end time (UTC): 2019 JAN 07 02:31:49
SO start time (UTC): 2019 JAN 07 01:56:57
SO end time (UTC): 2019 JAN 07 02:31:49
UVIS start time (UTC): 2019 JAN 07 01:56:57
UVIS end time (UTC): 2019 JAN 07 02:31:49
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 410
SO_COP_SCIENCE_2 = 416
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 162
CHECKSUM = 850
-------------------------------------------------------------------------------------------------------------


SO: Science: orders #164, #164, #164, #164, #164, #164, with 4000us integration time (6 orders per 1 second(s) for detector lines 120 to 136)
UVIS: SO: Horizontal Bin (140:205;0:1047), Tint = 45 ms,20 bit,Rhythm = 1057 ms, Binning=7

Calibration : Solar line scan #1 with SO and UVIS channel(s) in orbit nr. 5152
Calibration : Solar line scan #1 with SO and UVIS channel(s) on dayside nr. 247
Calibration : Solar line scan #1 with SO and UVIS channel(s) nr. 1
Calibration : Solar line scan #1 with SO and UVIS channel(s) in thermal orbit nr. 247 with orbit type nr. 3
TC20 execution start time (UTC): 2019 JAN 18 18:33:50
TC20 execution end time (UTC): 2019 JAN 18 19:28:00
SO start time (UTC): 2019 JAN 18 18:34:00
SO end time (UTC): 2019 JAN 18 19:28:00
UVIS start time (UTC): 2019 JAN 18 18:44:00
UVIS end time (UTC): 2019 JAN 18 19:28:00
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 3240
SO_COP_GENERAL = 1
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 3973
SO_COP_SCIENCE_2 = 3973
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 610
UVIS_DURATION_TIME = 2640
UVIS_COP_ROW = 317
CHECKSUM = 985
-------------------------------------------------------------------------------------------------------------


SO: Science: orders #164, #164, #164, #164, #164, #164, with 4000us integration time (6 orders per 1 second(s) for detector lines 120 to 136)
UVIS: SO: Horizontal Bin (140:205;0:1047), Tint = 45 ms,20 bit,Rhythm = 1057 ms, Binning=7

Calibration : Solar line scan #2 with SO and UVIS channel(s) in orbit nr. 5232
Calibration : Solar line scan #2 with SO and UVIS channel(s) on dayside nr. 326
Calibration : Solar line scan #2 with SO and UVIS channel(s) nr. 2
Calibration : Solar line scan #2 with SO and UVIS channel(s) in thermal orbit nr. 326 with orbit type nr. 4
TC20 execution start time (UTC): 2019 JAN 25 06:14:50
TC20 execution end time (UTC): 2019 JAN 25 07:09:00
SO start time (UTC): 2019 JAN 25 06:15:00
SO end time (UTC): 2019 JAN 25 07:09:00
UVIS start time (UTC): 2019 JAN 25 06:25:00
UVIS end time (UTC): 2019 JAN 25 07:09:00
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 3240
SO_COP_GENERAL = 1
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 3973
SO_COP_SCIENCE_2 = 3973
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 610
UVIS_DURATION_TIME = 2640
UVIS_COP_ROW = 317
CHECKSUM = 985
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 17685 to 17940kHz in steps of 1kHz (1 step(s) per 1 second(s))
LNO: AOTF frequency stepping (miniscan): 255 frequencies from 20011 to 20266kHz in steps of 1kHz (1 step(s) per 1 second(s))
UVIS: SO: Full Frame (140:205;0:1047),Tint = 45 ms,16 bit,Rhythm = 3361 ms, Binning=0

Calibration : Mini-scan #1+#2 with LNO and UVIS channel(s) in orbit nr. 5364
Calibration : Mini-scan #1+#2 with LNO and UVIS channel(s) on dayside nr. 116
Calibration : Mini-scan #1+#2 with LNO and UVIS channel(s) nr. 1+2
Calibration : Mini-scan #1+#2 with LNO and UVIS channel(s) in thermal orbit nr. 116 with orbit type nr. 4
TC20 execution start time (UTC): 2019 FEB 05 01:40:06
TC20 execution end time (UTC): 2019 FEB 05 02:15:08
LNO start time (UTC): 2019 FEB 05 01:40:16
LNO end time (UTC): 2019 FEB 05 02:15:08
UVIS start time (UTC): 2019 FEB 05 01:40:16
UVIS end time (UTC): 2019 FEB 05 02:15:08
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 1356
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 2092
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 331
LNO_COP_SCIENCE_2 = 334
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 293
CHECKSUM = 565
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 20784 to 21039kHz in steps of 1kHz (1 step(s) per 1 second(s))
LNO: AOTF frequency stepping (miniscan): 255 frequencies from 23256 to 23511kHz in steps of 1kHz (1 step(s) per 1 second(s))
UVIS: SO: Full Frame (140:205;0:1047),Tint = 45 ms,16 bit,Rhythm = 3361 ms, Binning=0

Calibration : Mini-scan #3+#4 with LNO and UVIS channel(s) in orbit nr. 5364
Calibration : Mini-scan #3+#4 with LNO and UVIS channel(s) on dayside nr. 116
Calibration : Mini-scan #3+#4 with LNO and UVIS channel(s) nr. 3+4
Calibration : Mini-scan #3+#4 with LNO and UVIS channel(s) in thermal orbit nr. 116 with orbit type nr. 4
TC20 execution start time (UTC): 2019 FEB 05 02:15:13
TC20 execution end time (UTC): 2019 FEB 05 02:50:16
LNO start time (UTC): 2019 FEB 05 02:15:23
LNO end time (UTC): 2019 FEB 05 02:50:15
UVIS start time (UTC): 2019 FEB 05 02:15:23
UVIS end time (UTC): 2019 FEB 05 02:50:15
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 1356
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 2092
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 336
LNO_COP_SCIENCE_2 = 339
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 293
CHECKSUM = 575
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 17064 to 19104kHz in steps of 8kHz (1 step(s) per 1 second(s))
LNO: AOTF frequency stepping (miniscan): 255 frequencies from 19856 to 21896kHz in steps of 8kHz (1 step(s) per 1 second(s))
UVIS: SO: Full Frame (140:205;0:1047),Tint = 45 ms,16 bit,Rhythm = 3361 ms, Binning=0

Calibration : Mini-scan #5+#6 with LNO and UVIS channel(s) in orbit nr. 5456
Calibration : Mini-scan #5+#6 with LNO and UVIS channel(s) on dayside nr. 208
Calibration : Mini-scan #5+#6 with LNO and UVIS channel(s) nr. 5+6
Calibration : Mini-scan #5+#6 with LNO and UVIS channel(s) in thermal orbit nr. 208 with orbit type nr. 17
TC20 execution start time (UTC): 2019 FEB 12 14:24:01
TC20 execution end time (UTC): 2019 FEB 12 14:59:03
LNO start time (UTC): 2019 FEB 12 14:24:11
LNO end time (UTC): 2019 FEB 12 14:59:03
UVIS start time (UTC): 2019 FEB 12 14:24:11
UVIS end time (UTC): 2019 FEB 12 14:59:03
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 1356
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 2092
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 437
LNO_COP_SCIENCE_2 = 440
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 293
CHECKSUM = 777
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 22639 to 24679kHz in steps of 8kHz (1 step(s) per 1 second(s))
LNO: AOTF frequency stepping (miniscan): 255 frequencies from 28176 to 30216kHz in steps of 8kHz (1 step(s) per 1 second(s))
UVIS: SO: Full Frame (140:205;0:1047),Tint = 45 ms,16 bit,Rhythm = 3361 ms, Binning=0

Calibration : Mini-scan #7+#8 with LNO and UVIS channel(s) in orbit nr. 5456
Calibration : Mini-scan #7+#8 with LNO and UVIS channel(s) on dayside nr. 208
Calibration : Mini-scan #7+#8 with LNO and UVIS channel(s) nr. 7+8
Calibration : Mini-scan #7+#8 with LNO and UVIS channel(s) in thermal orbit nr. 208 with orbit type nr. 17
TC20 execution start time (UTC): 2019 FEB 12 14:59:08
TC20 execution end time (UTC): 2019 FEB 12 15:34:11
LNO start time (UTC): 2019 FEB 12 14:59:18
LNO end time (UTC): 2019 FEB 12 15:34:10
UVIS start time (UTC): 2019 FEB 12 14:59:18
UVIS end time (UTC): 2019 FEB 12 15:34:10
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 1356
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 2092
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 443
LNO_COP_SCIENCE_2 = 449
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 293
CHECKSUM = 792
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 16686 to 16941kHz in steps of 1kHz (1 step(s) per 1 second(s))
SO: AOTF frequency stepping (miniscan): 255 frequencies from 18883 to 19138kHz in steps of 1kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (47:240;0:1047),Tint = 7000 ms,16 bit,Rhythm = 9070 ms, Binning=0

Calibration : Mini-scan #9+#10 with SO and UVIS channel(s) in orbit nr. 5586
Calibration : Mini-scan #9+#10 with SO and UVIS channel(s) on dayside nr. 338
Calibration : Mini-scan #9+#10 with SO and UVIS channel(s) nr. 9+10
Calibration : Mini-scan #9+#10 with SO and UVIS channel(s) in thermal orbit nr. 338 with orbit type nr. 17
TC20 execution start time (UTC): 2019 FEB 23 05:43:49
TC20 execution end time (UTC): 2019 FEB 23 06:18:51
SO start time (UTC): 2019 FEB 23 05:43:59
SO end time (UTC): 2019 FEB 23 06:18:51
UVIS start time (UTC): 2019 FEB 23 05:43:59
UVIS end time (UTC): 2019 FEB 23 06:18:51
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 298
SO_COP_SCIENCE_2 = 301
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 48
CHECKSUM = 509
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 19614 to 19869kHz in steps of 1kHz (1 step(s) per 1 second(s))
SO: AOTF frequency stepping (miniscan): 255 frequencies from 21947 to 22202kHz in steps of 1kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (47:240;0:1047),Tint = 7000 ms,16 bit,Rhythm = 9070 ms, Binning=0

Calibration : Mini-scan #11+#12 with SO and UVIS channel(s) in orbit nr. 5586
Calibration : Mini-scan #11+#12 with SO and UVIS channel(s) on dayside nr. 338
Calibration : Mini-scan #11+#12 with SO and UVIS channel(s) nr. 11+12
Calibration : Mini-scan #11+#12 with SO and UVIS channel(s) in thermal orbit nr. 338 with orbit type nr. 17
TC20 execution start time (UTC): 2019 FEB 23 06:18:56
TC20 execution end time (UTC): 2019 FEB 23 06:53:59
SO start time (UTC): 2019 FEB 23 06:19:06
SO end time (UTC): 2019 FEB 23 06:53:58
UVIS start time (UTC): 2019 FEB 23 06:19:06
UVIS end time (UTC): 2019 FEB 23 06:53:58
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 303
SO_COP_SCIENCE_2 = 306
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 48
CHECKSUM = 519
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 16098 to 18138kHz in steps of 8kHz (1 step(s) per 1 second(s))
UVIS: STEPPER CALIBRATION: Full Frame (140:205;0:1047),Tint = 40 ms,16 bit,Rhythm = 3361 ms, Binning=0

Calibration : Mini-scan #1 with SO and UVIS channel(s) in orbit nr. 5644
Calibration : Mini-scan #1 with SO and UVIS channel(s) on dayside nr. 54
Calibration : Mini-scan #1 with SO and UVIS channel(s) nr. 1
Calibration : Mini-scan #1 with SO and UVIS channel(s) in thermal orbit nr. 54 with orbit type nr. 3
TC20 execution start time (UTC): 2019 FEB 27 23:43:04
TC20 execution end time (UTC): 2019 FEB 28 00:18:06
SO start time (UTC): 2019 FEB 27 23:43:14
SO end time (UTC): 2019 FEB 28 00:18:06
UVIS start time (UTC): 2019 FEB 27 23:43:14
UVIS end time (UTC): 2019 FEB 28 00:18:06
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 404
SO_COP_SCIENCE_2 = 404
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 4
CHECKSUM = 674
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 18737 to 20777kHz in steps of 8kHz (1 step(s) per 1 second(s))
UVIS: STEPPER CALIBRATION: Full Frame (140:205;0:1047),Tint = 40 ms,16 bit,Rhythm = 3361 ms, Binning=0

Calibration : Mini-scan #2 with SO and UVIS channel(s) in orbit nr. 5644
Calibration : Mini-scan #2 with SO and UVIS channel(s) on dayside nr. 54
Calibration : Mini-scan #2 with SO and UVIS channel(s) nr. 2
Calibration : Mini-scan #2 with SO and UVIS channel(s) in thermal orbit nr. 54 with orbit type nr. 3
TC20 execution start time (UTC): 2019 FEB 28 00:18:11
TC20 execution end time (UTC): 2019 FEB 28 00:53:13
SO start time (UTC): 2019 FEB 28 00:18:21
SO end time (UTC): 2019 FEB 28 00:53:13
UVIS start time (UTC): 2019 FEB 28 00:18:21
UVIS end time (UTC): 2019 FEB 28 00:53:13
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 407
SO_COP_SCIENCE_2 = 407
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 4
CHECKSUM = 680
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 21365 to 23405kHz in steps of 8kHz (1 step(s) per 1 second(s))
UVIS: SO: Full Frame (140:205;0:1047),Tint = 45 ms,16 bit,Rhythm = 3361 ms, Binning=0

Calibration : Mini-scan #3 with SO and UVIS channel(s) in orbit nr. 5730
Calibration : Mini-scan #3 with SO and UVIS channel(s) on dayside nr. 140
Calibration : Mini-scan #3 with SO and UVIS channel(s) nr. 3
Calibration : Mini-scan #3 with SO and UVIS channel(s) in thermal orbit nr. 140 with orbit type nr. 17
TC20 execution start time (UTC): 2019 MAR 07 00:41:05
TC20 execution end time (UTC): 2019 MAR 07 01:16:07
SO start time (UTC): 2019 MAR 07 00:41:15
SO end time (UTC): 2019 MAR 07 01:16:07
UVIS start time (UTC): 2019 MAR 07 00:41:15
UVIS end time (UTC): 2019 MAR 07 01:16:07
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 410
SO_COP_SCIENCE_2 = 410
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 293
CHECKSUM = 720
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 26586 to 28626kHz in steps of 8kHz (1 step(s) per 1 second(s))
UVIS: SO: Full Frame (140:205;0:1047),Tint = 45 ms,16 bit,Rhythm = 3361 ms, Binning=0

Calibration : Mini-scan #4 with SO and UVIS channel(s) in orbit nr. 5730
Calibration : Mini-scan #4 with SO and UVIS channel(s) on dayside nr. 140
Calibration : Mini-scan #4 with SO and UVIS channel(s) nr. 4
Calibration : Mini-scan #4 with SO and UVIS channel(s) in thermal orbit nr. 140 with orbit type nr. 17
TC20 execution start time (UTC): 2019 MAR 07 01:16:12
TC20 execution end time (UTC): 2019 MAR 07 01:51:14
SO start time (UTC): 2019 MAR 07 01:16:22
SO end time (UTC): 2019 MAR 07 01:51:14
UVIS start time (UTC): 2019 MAR 07 01:16:22
UVIS end time (UTC): 2019 MAR 07 01:51:14
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 416
SO_COP_SCIENCE_2 = 416
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 293
CHECKSUM = 732
-------------------------------------------------------------------------------------------------------------


SO: Diffraction order stepping (fullscan): 115 orders from 110 to 225 in steps of 1 (1 order(s) per 1 second(s))
UVIS: SO: Full Frame (140:205;0:1047),Tint = 45 ms,16 bit,Rhythm = 3361 ms, Binning=0

Calibration : Full-scan #5 with SO and UVIS channel(s) in orbit nr. 5816
Calibration : Full-scan #5 with SO and UVIS channel(s) on dayside nr. 226
Calibration : Full-scan #5 with SO and UVIS channel(s) nr. 5
Calibration : Full-scan #5 with SO and UVIS channel(s) in thermal orbit nr. 226 with orbit type nr. 4
TC20 execution start time (UTC): 2019 MAR 14 01:43:31
TC20 execution end time (UTC): 2019 MAR 14 02:18:33
SO start time (UTC): 2019 MAR 14 01:43:41
SO end time (UTC): 2019 MAR 14 02:18:33
UVIS start time (UTC): 2019 MAR 14 01:43:41
UVIS end time (UTC): 2019 MAR 14 02:18:33
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 107
SO_COP_SCIENCE_2 = 107
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 293
CHECKSUM = 624
-------------------------------------------------------------------------------------------------------------


LNO: Diffraction order stepping (fullscan): 105 orders from 110 to 215 in steps of 1 (1 order(s) per 1 second(s))
UVIS: SO: Full Frame (140:205;0:1047),Tint = 45 ms,16 bit,Rhythm = 3361 ms, Binning=0

Calibration : Full-scan #6 with LNO and UVIS channel(s) in orbit nr. 5816
Calibration : Full-scan #6 with LNO and UVIS channel(s) on dayside nr. 226
Calibration : Full-scan #6 with LNO and UVIS channel(s) nr. 6
Calibration : Full-scan #6 with LNO and UVIS channel(s) in thermal orbit nr. 226 with orbit type nr. 4
TC20 execution start time (UTC): 2019 MAR 14 02:18:38
TC20 execution end time (UTC): 2019 MAR 14 02:53:40
LNO start time (UTC): 2019 MAR 14 02:18:48
LNO end time (UTC): 2019 MAR 14 02:53:40
UVIS start time (UTC): 2019 MAR 14 02:18:48
UVIS end time (UTC): 2019 MAR 14 02:53:40
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 1356
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 2092
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 57
LNO_COP_SCIENCE_2 = 57
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 293
CHECKSUM = 524
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 28176 to 28431kHz in steps of 1kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 20000 ms,16 bit,Rhythm = 21964 ms, Binning=0

Calibration : Mini-scan #1 with LNO and UVIS channel(s) in orbit nr. 6122
Calibration : Mini-scan #1 with LNO and UVIS channel(s) on dayside nr. 190
Calibration : Mini-scan #1 with LNO and UVIS channel(s) nr. 1
Calibration : Mini-scan #1 with LNO and UVIS channel(s) in thermal orbit nr. 190 with orbit type nr. 14
TC20 execution start time (UTC): 2019 APR 08 03:29:50
TC20 execution end time (UTC): 2019 APR 08 04:04:52
LNO start time (UTC): 2019 APR 08 03:30:00
LNO end time (UTC): 2019 APR 08 04:04:52
UVIS start time (UTC): 2019 APR 08 03:30:00
UVIS end time (UTC): 2019 APR 08 04:04:52
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 1356
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 2092
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 352
LNO_COP_SCIENCE_2 = 352
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 79
CHECKSUM = 645
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 28176 to 29196kHz in steps of 4kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 20000 ms,16 bit,Rhythm = 21964 ms, Binning=0

Calibration : Mini-scan #2 with LNO and UVIS channel(s) in orbit nr. 6122
Calibration : Mini-scan #2 with LNO and UVIS channel(s) on dayside nr. 190
Calibration : Mini-scan #2 with LNO and UVIS channel(s) nr. 2
Calibration : Mini-scan #2 with LNO and UVIS channel(s) in thermal orbit nr. 190 with orbit type nr. 14
TC20 execution start time (UTC): 2019 APR 08 04:04:57
TC20 execution end time (UTC): 2019 APR 08 04:39:59
LNO start time (UTC): 2019 APR 08 04:05:07
LNO end time (UTC): 2019 APR 08 04:39:59
UVIS start time (UTC): 2019 APR 08 04:05:07
UVIS end time (UTC): 2019 APR 08 04:39:59
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 1356
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 2092
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 428
LNO_COP_SCIENCE_2 = 428
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 79
CHECKSUM = 797
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 26586 to 26841kHz in steps of 1kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 20000 ms,16 bit,Rhythm = 21964 ms, Binning=0

Calibration : Mini-scan #3 with SO and UVIS channel(s) in orbit nr. 6219
Calibration : Mini-scan #3 with SO and UVIS channel(s) on dayside nr. 287
Calibration : Mini-scan #3 with SO and UVIS channel(s) nr. 3
Calibration : Mini-scan #3 with SO and UVIS channel(s) in thermal orbit nr. 287 with orbit type nr. 17
TC20 execution start time (UTC): 2019 APR 16 02:09:50
TC20 execution end time (UTC): 2019 APR 16 02:44:52
SO start time (UTC): 2019 APR 16 02:10:00
SO end time (UTC): 2019 APR 16 02:44:52
UVIS start time (UTC): 2019 APR 16 02:10:00
UVIS end time (UTC): 2019 APR 16 02:44:52
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 319
SO_COP_SCIENCE_2 = 319
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 79
CHECKSUM = 579
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 26586 to 27606kHz in steps of 4kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 20000 ms,16 bit,Rhythm = 21964 ms, Binning=0

Calibration : Mini-scan #4 with SO and UVIS channel(s) in orbit nr. 6219
Calibration : Mini-scan #4 with SO and UVIS channel(s) on dayside nr. 287
Calibration : Mini-scan #4 with SO and UVIS channel(s) nr. 4
Calibration : Mini-scan #4 with SO and UVIS channel(s) in thermal orbit nr. 287 with orbit type nr. 17
TC20 execution start time (UTC): 2019 APR 16 02:44:57
TC20 execution end time (UTC): 2019 APR 16 03:19:59
SO start time (UTC): 2019 APR 16 02:45:07
SO end time (UTC): 2019 APR 16 03:19:59
UVIS start time (UTC): 2019 APR 16 02:45:07
UVIS end time (UTC): 2019 APR 16 03:19:59
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 395
SO_COP_SCIENCE_2 = 395
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 79
CHECKSUM = 731
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 16979 to 19019kHz in steps of 8kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 20000 ms,16 bit,Rhythm = 21964 ms, Binning=0

Calibration : Mini-scan #1 with SO and UVIS channel(s) in orbit nr. 6289
Calibration : Mini-scan #1 with SO and UVIS channel(s) on dayside nr. 15
Calibration : Mini-scan #1 with SO and UVIS channel(s) nr. 1
Calibration : Mini-scan #1 with SO and UVIS channel(s) in thermal orbit nr. 15 with orbit type nr. 14
TC20 execution start time (UTC): 2019 APR 21 19:32:36
TC20 execution end time (UTC): 2019 APR 21 20:07:38
SO start time (UTC): 2019 APR 21 19:32:46
SO end time (UTC): 2019 APR 21 20:07:38
UVIS start time (UTC): 2019 APR 21 19:32:46
UVIS end time (UTC): 2019 APR 21 20:07:38
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 405
SO_COP_SCIENCE_2 = 405
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 79
CHECKSUM = 751
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 17859 to 19899kHz in steps of 8kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 20000 ms,16 bit,Rhythm = 21964 ms, Binning=0

Calibration : Mini-scan #2 with SO and UVIS channel(s) in orbit nr. 6289
Calibration : Mini-scan #2 with SO and UVIS channel(s) on dayside nr. 15
Calibration : Mini-scan #2 with SO and UVIS channel(s) nr. 2
Calibration : Mini-scan #2 with SO and UVIS channel(s) in thermal orbit nr. 15 with orbit type nr. 14
TC20 execution start time (UTC): 2019 APR 21 20:07:43
TC20 execution end time (UTC): 2019 APR 21 20:42:45
SO start time (UTC): 2019 APR 21 20:07:53
SO end time (UTC): 2019 APR 21 20:42:45
UVIS start time (UTC): 2019 APR 21 20:07:53
UVIS end time (UTC): 2019 APR 21 20:42:45
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 406
SO_COP_SCIENCE_2 = 406
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 79
CHECKSUM = 753
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 19614 to 21654kHz in steps of 8kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 20000 ms,16 bit,Rhythm = 21964 ms, Binning=0

Calibration : Mini-scan #3 with SO and UVIS channel(s) in orbit nr. 6363
Calibration : Mini-scan #3 with SO and UVIS channel(s) on dayside nr. 89
Calibration : Mini-scan #3 with SO and UVIS channel(s) nr. 3
Calibration : Mini-scan #3 with SO and UVIS channel(s) in thermal orbit nr. 89 with orbit type nr. 3
TC20 execution start time (UTC): 2019 APR 27 20:56:43
TC20 execution end time (UTC): 2019 APR 27 21:31:45
SO start time (UTC): 2019 APR 27 20:56:53
SO end time (UTC): 2019 APR 27 21:31:45
UVIS start time (UTC): 2019 APR 27 20:56:53
UVIS end time (UTC): 2019 APR 27 21:31:45
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 408
SO_COP_SCIENCE_2 = 408
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 79
CHECKSUM = 757
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 20490 to 22530kHz in steps of 8kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 20000 ms,16 bit,Rhythm = 21964 ms, Binning=0

Calibration : Mini-scan #4 with SO and UVIS channel(s) in orbit nr. 6363
Calibration : Mini-scan #4 with SO and UVIS channel(s) on dayside nr. 89
Calibration : Mini-scan #4 with SO and UVIS channel(s) nr. 4
Calibration : Mini-scan #4 with SO and UVIS channel(s) in thermal orbit nr. 89 with orbit type nr. 3
TC20 execution start time (UTC): 2019 APR 27 21:31:50
TC20 execution end time (UTC): 2019 APR 27 22:06:52
SO start time (UTC): 2019 APR 27 21:32:00
SO end time (UTC): 2019 APR 27 22:06:52
UVIS start time (UTC): 2019 APR 27 21:32:00
UVIS end time (UTC): 2019 APR 27 22:06:52
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 409
SO_COP_SCIENCE_2 = 409
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 79
CHECKSUM = 759
-------------------------------------------------------------------------------------------------------------


LNO: Detector window stepping: 1 step(s) covering detector lines 140 to 164 (1 step(s) per 1 second(s))
UVIS: SO: Horizontal Bin (140:205;0:1047), Tint = 45 ms,20 bit,Rhythm = 1057 ms, Binning=7

Calibration : Solar line scan #1 with LNO and UVIS channel(s) in orbit nr. 6630
Calibration : Solar line scan #1 with LNO and UVIS channel(s) on dayside nr. 13
Calibration : Solar line scan #1 with LNO and UVIS channel(s) nr. 1
Calibration : Solar line scan #1 with LNO and UVIS channel(s) in thermal orbit nr. 13 with orbit type nr. 3
TC20 execution start time (UTC): 2019 MAY 19 16:08:55
TC20 execution end time (UTC): 2019 MAY 19 17:03:05
LNO start time (UTC): 2019 MAY 19 16:09:05
LNO end time (UTC): 2019 MAY 19 17:03:05
UVIS start time (UTC): 2019 MAY 19 16:19:05
UVIS end time (UTC): 2019 MAY 19 17:03:05
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 1356
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 3240
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 5
LNO_COP_SCIENCE_2 = 5
UVIS_START_TIME = 610
UVIS_DURATION_TIME = 2640
UVIS_COP_ROW = 394
CHECKSUM = 777
-------------------------------------------------------------------------------------------------------------


SO: Diffraction order stepping (fullscan): 115 orders from 110 to 225 in steps of 1 (1 order(s) per 1 second(s))
UVIS: STEPPER CALIBRATION: Full Frame (140:205;0:1047),Tint = 40 ms,16 bit,Rhythm = 3361 ms, Binning=0

Calibration : Full-scan #1 with SO and UVIS channel(s) in orbit nr. 6794
Calibration : Full-scan #1 with SO and UVIS channel(s) on dayside nr. 177
Calibration : Full-scan #1 with SO and UVIS channel(s) nr. 1
Calibration : Full-scan #1 with SO and UVIS channel(s) in thermal orbit nr. 177 with orbit type nr. 14
TC20 execution start time (UTC): 2019 JUN 02 02:16:18
TC20 execution end time (UTC): 2019 JUN 02 02:51:20
SO start time (UTC): 2019 JUN 02 02:16:28
SO end time (UTC): 2019 JUN 02 02:51:20
UVIS start time (UTC): 2019 JUN 02 02:31:20
UVIS end time (UTC): 2019 JUN 02 02:36:20
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 107
SO_COP_SCIENCE_2 = 107
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 902
UVIS_DURATION_TIME = 300
UVIS_COP_ROW = 4
CHECKSUM = 710
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 18737 to 19757kHz in steps of 4kHz (1 step(s) per 1 second(s))
UVIS: STEPPER CALIBRATION: Full Frame (140:205;0:1047),Tint = 40 ms,16 bit,Rhythm = 3361 ms, Binning=0

Calibration : Mini-scan #1 with SO and UVIS channel(s) in orbit nr. 6794
Calibration : Mini-scan #1 with SO and UVIS channel(s) on dayside nr. 177
Calibration : Mini-scan #1 with SO and UVIS channel(s) nr. 1
Calibration : Mini-scan #1 with SO and UVIS channel(s) in thermal orbit nr. 177 with orbit type nr. 14
TC20 execution start time (UTC): 2019 JUN 02 02:51:25
TC20 execution end time (UTC): 2019 JUN 02 03:26:27
SO start time (UTC): 2019 JUN 02 02:51:35
SO end time (UTC): 2019 JUN 02 03:26:27
UVIS start time (UTC): 2019 JUN 02 03:06:27
UVIS end time (UTC): 2019 JUN 02 03:11:27
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 2092
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 377
SO_COP_SCIENCE_2 = 377
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 902
UVIS_DURATION_TIME = 300
UVIS_COP_ROW = 4
CHECKSUM = 740
-------------------------------------------------------------------------------------------------------------


LNO: Diffraction order stepping (fullscan): 105 orders from 110 to 215 in steps of 1 (1 order(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 20000 ms,16 bit,Rhythm = 21964 ms, Binning=0

Calibration : Full-scan #2 with LNO and UVIS channel(s) in orbit nr. 6879
Calibration : Full-scan #2 with LNO and UVIS channel(s) on dayside nr. 262
Calibration : Full-scan #2 with LNO and UVIS channel(s) nr. 2
Calibration : Full-scan #2 with LNO and UVIS channel(s) in thermal orbit nr. 262 with orbit type nr. 3
TC20 execution start time (UTC): 2019 JUN 09 01:15:15
TC20 execution end time (UTC): 2019 JUN 09 01:50:17
LNO start time (UTC): 2019 JUN 09 01:15:25
LNO end time (UTC): 2019 JUN 09 01:50:17
UVIS start time (UTC): 2019 JUN 09 01:15:25
UVIS end time (UTC): 2019 JUN 09 01:50:17
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 1356
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 2092
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 57
LNO_COP_SCIENCE_2 = 57
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 79
CHECKSUM = 565
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 19856 to 20876kHz in steps of 4kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Full Frame (57:240;0:1047),Tint = 20000 ms,16 bit,Rhythm = 21964 ms, Binning=0

Calibration : Mini-scan #2 with LNO and UVIS channel(s) in orbit nr. 6879
Calibration : Mini-scan #2 with LNO and UVIS channel(s) on dayside nr. 262
Calibration : Mini-scan #2 with LNO and UVIS channel(s) nr. 2
Calibration : Mini-scan #2 with LNO and UVIS channel(s) in thermal orbit nr. 262 with orbit type nr. 3
TC20 execution start time (UTC): 2019 JUN 09 01:50:22
TC20 execution end time (UTC): 2019 JUN 09 02:25:24
LNO start time (UTC): 2019 JUN 09 01:50:32
LNO end time (UTC): 2019 JUN 09 02:25:24
UVIS start time (UTC): 2019 JUN 09 01:50:32
UVIS end time (UTC): 2019 JUN 09 02:25:24
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 1356
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 2092
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 410
LNO_COP_SCIENCE_2 = 410
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 79
CHECKSUM = 761
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 17064 to 19104kHz in steps of 8kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Horizontal Bin (57:240;0:1047), Tint = 20000 ms,20 bit,Rhythm = 21964 ms, Binning=3

Calibration : Mini-scan #1 with LNO and UVIS channel(s) in orbit nr. 7037
Calibration : Mini-scan #1 with LNO and UVIS channel(s) on dayside nr. 78
Calibration : Mini-scan #1 with LNO and UVIS channel(s) nr. 1
Calibration : Mini-scan #1 with LNO and UVIS channel(s) in thermal orbit nr. 78 with orbit type nr. 7
TC20 execution start time (UTC): 2019 JUN 21 23:41:28
TC20 execution end time (UTC): 2019 JUN 22 00:16:30
LNO start time (UTC): 2019 JUN 21 23:41:38
LNO end time (UTC): 2019 JUN 22 00:16:30
UVIS start time (UTC): 2019 JUN 21 23:41:38
UVIS end time (UTC): 2019 JUN 22 00:16:30
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 1356
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 2092
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 437
LNO_COP_SCIENCE_2 = 437
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 95
CHECKSUM = 831
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 19856 to 21896kHz in steps of 8kHz (1 step(s) per 1 second(s))
UVIS: NADIR: Horizontal Bin (57:240;0:1047), Tint = 20000 ms,20 bit,Rhythm = 21964 ms, Binning=3

Calibration : Mini-scan #2 with LNO and UVIS channel(s) in orbit nr. 7037
Calibration : Mini-scan #2 with LNO and UVIS channel(s) on dayside nr. 78
Calibration : Mini-scan #2 with LNO and UVIS channel(s) nr. 2
Calibration : Mini-scan #2 with LNO and UVIS channel(s) in thermal orbit nr. 78 with orbit type nr. 7
TC20 execution start time (UTC): 2019 JUN 22 00:16:35
TC20 execution end time (UTC): 2019 JUN 22 00:51:37
LNO start time (UTC): 2019 JUN 22 00:16:45
LNO end time (UTC): 2019 JUN 22 00:51:37
UVIS start time (UTC): 2019 JUN 22 00:16:45
UVIS end time (UTC): 2019 JUN 22 00:51:37
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 1356
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 2092
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 440
LNO_COP_SCIENCE_2 = 440
UVIS_START_TIME = 10
UVIS_DURATION_TIME = 2092
UVIS_COP_ROW = 95
CHECKSUM = 837
-------------------------------------------------------------------------------------------------------------


LNO: Detector window stepping: 1 step(s) covering detector lines 140 to 164 (1 step(s) per 1 second(s))
UVIS: SO: Horizontal Bin (140:205;0:1047), Tint = 45 ms,20 bit,Rhythm = 1389 ms, Binning=3

Calibration : Solar line scan #1 with LNO and UVIS channel(s) in orbit nr. 7190
Calibration : Solar line scan #1 with LNO and UVIS channel(s) on dayside nr. 231
Calibration : Solar line scan #1 with LNO and UVIS channel(s) nr. 1
Calibration : Solar line scan #1 with LNO and UVIS channel(s) in thermal orbit nr. 231 with orbit type nr. 14
TC20 execution start time (UTC): 2019 JUL 04 12:15:26
TC20 execution end time (UTC): 2019 JUL 04 13:09:36
LNO start time (UTC): 2019 JUL 04 12:15:36
LNO end time (UTC): 2019 JUL 04 13:09:36
UVIS start time (UTC): 2019 JUL 04 12:25:36
UVIS end time (UTC): 2019 JUL 04 13:09:36
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 1356
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 3240
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 5
LNO_COP_SCIENCE_2 = 5
UVIS_START_TIME = 610
UVIS_DURATION_TIME = 2640
UVIS_COP_ROW = 382
CHECKSUM = 765
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 17996 to 20036kHz in steps of 8kHz (1 step(s) per 1 second(s))
LNO: AOTF frequency stepping (miniscan): 255 frequencies from 18927 to 20967kHz in steps of 8kHz (1 step(s) per 1 second(s))

Calibration : Mini-scan #1+#2 with LNO channel(s) in orbit nr. 7477
Calibration : Mini-scan #1+#2 with LNO channel(s) on dayside nr. 177
Calibration : Mini-scan #1+#2 with LNO channel(s) nr. 1+2
Calibration : Mini-scan #1+#2 with LNO channel(s) in thermal orbit nr. 177 with orbit type nr. 14
TC20 execution start time (UTC): 2019 JUL 28 01:27:02
TC20 execution end time (UTC): 2019 JUL 28 02:37:12
LNO start time (UTC): 2019 JUL 28 01:27:12
LNO end time (UTC): 2019 JUL 28 02:37:12
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 2410
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 4200
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 438
LNO_COP_SCIENCE_2 = 439
UVIS_START_TIME = 0
UVIS_DURATION_TIME = 0
UVIS_COP_ROW = 0
CHECKSUM = 779
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 20784 to 22824kHz in steps of 8kHz (1 step(s) per 1 second(s))
LNO: AOTF frequency stepping (miniscan): 255 frequencies from 21712 to 23752kHz in steps of 8kHz (1 step(s) per 1 second(s))

Calibration : Mini-scan #3+#4 with LNO channel(s) in orbit nr. 7628
Calibration : Mini-scan #3+#4 with LNO channel(s) on dayside nr. 328
Calibration : Mini-scan #3+#4 with LNO channel(s) nr. 3+4
Calibration : Mini-scan #3+#4 with LNO channel(s) in thermal orbit nr. 328 with orbit type nr. 14
TC20 execution start time (UTC): 2019 AUG 09 10:14:41
TC20 execution end time (UTC): 2019 AUG 09 11:24:51
LNO start time (UTC): 2019 AUG 09 10:14:51
LNO end time (UTC): 2019 AUG 09 11:24:51
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 2410
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 4200
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 441
LNO_COP_SCIENCE_2 = 442
UVIS_START_TIME = 0
UVIS_DURATION_TIME = 0
UVIS_COP_ROW = 0
CHECKSUM = 785
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 22238 to 24278kHz in steps of 8kHz (1 step(s) per 1 second(s))
SO: AOTF frequency stepping (miniscan): 255 frequencies from 23110 to 25150kHz in steps of 8kHz (1 step(s) per 1 second(s))

Calibration : Mini-scan #1+#2 with SO channel(s) in orbit nr. 7708
Calibration : Mini-scan #1+#2 with SO channel(s) on dayside nr. 66
Calibration : Mini-scan #1+#2 with SO channel(s) nr. 1+2
Calibration : Mini-scan #1+#2 with SO channel(s) in thermal orbit nr. 66 with orbit type nr. 3
TC20 execution start time (UTC): 2019 AUG 15 23:30:42
TC20 execution end time (UTC): 2019 AUG 16 00:40:52
SO start time (UTC): 2019 AUG 15 23:30:52
SO end time (UTC): 2019 AUG 16 00:40:52
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 2410
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 4200
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 411
SO_COP_SCIENCE_2 = 412
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 0
UVIS_DURATION_TIME = 0
UVIS_COP_ROW = 0
CHECKSUM = 725
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 23981 to 26021kHz in steps of 8kHz (1 step(s) per 1 second(s))
SO: AOTF frequency stepping (miniscan): 255 frequencies from 24851 to 26891kHz in steps of 8kHz (1 step(s) per 1 second(s))

Calibration : Mini-scan #3+#4 with SO channel(s) in orbit nr. 7745
Calibration : Mini-scan #3+#4 with SO channel(s) on dayside nr. 103
Calibration : Mini-scan #3+#4 with SO channel(s) nr. 3+4
Calibration : Mini-scan #3+#4 with SO channel(s) in thermal orbit nr. 103 with orbit type nr. 14
TC20 execution start time (UTC): 2019 AUG 19 00:15:32
TC20 execution end time (UTC): 2019 AUG 19 01:25:42
SO start time (UTC): 2019 AUG 19 00:15:42
SO end time (UTC): 2019 AUG 19 01:25:42
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 2410
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 4200
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 413
SO_COP_SCIENCE_2 = 414
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 0
UVIS_DURATION_TIME = 0
UVIS_COP_ROW = 0
CHECKSUM = 729
-------------------------------------------------------------------------------------------------------------


SO: Diffraction order stepping (fullscan): 115 orders from 110 to 225 in steps of 1 (1 order(s) per 1 second(s))

Calibration : Full-scan #1 with SO channel(s) in orbit nr. 8088
Calibration : Full-scan #1 with SO channel(s) on dayside nr. 17
Calibration : Full-scan #1 with SO channel(s) nr. 1
Calibration : Full-scan #1 with SO channel(s) in thermal orbit nr. 17 with orbit type nr. 14
TC20 execution start time (UTC): 2019 SEP 16 00:51:53
TC20 execution end time (UTC): 2019 SEP 16 02:02:03
SO start time (UTC): 2019 SEP 16 00:52:03
SO end time (UTC): 2019 SEP 16 02:02:03
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 2410
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 4200
SO_COP_GENERAL = 2
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 107
SO_COP_SCIENCE_2 = 107
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 0
UVIS_DURATION_TIME = 0
UVIS_COP_ROW = 0
CHECKSUM = 626
-------------------------------------------------------------------------------------------------------------


LNO: Diffraction order stepping (fullscan): 105 orders from 110 to 215 in steps of 1 (1 order(s) per 1 second(s))

Calibration : Full-scan #2 with LNO channel(s) in orbit nr. 8160
Calibration : Full-scan #2 with LNO channel(s) on dayside nr. 89
Calibration : Full-scan #2 with LNO channel(s) nr. 2
Calibration : Full-scan #2 with LNO channel(s) in thermal orbit nr. 89 with orbit type nr. 14
TC20 execution start time (UTC): 2019 SEP 21 22:23:54
TC20 execution end time (UTC): 2019 SEP 21 23:34:04
LNO start time (UTC): 2019 SEP 21 22:24:04
LNO end time (UTC): 2019 SEP 21 23:34:04
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 2410
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 4200
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 57
LNO_COP_SCIENCE_2 = 57
UVIS_START_TIME = 0
UVIS_DURATION_TIME = 0
UVIS_COP_ROW = 0
CHECKSUM = 526
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 25412 to 27452kHz in steps of 8kHz (1 step(s) per 1 second(s))
LNO: AOTF frequency stepping (miniscan): 255 frequencies from 26335 to 28375kHz in steps of 8kHz (1 step(s) per 1 second(s))

Calibration : Mini-scan #1+#2 with LNO channel(s) in orbit nr. 8283
Calibration : Mini-scan #1+#2 with LNO channel(s) on dayside nr. 212
Calibration : Mini-scan #1+#2 with LNO channel(s) nr. 1+2
Calibration : Mini-scan #1+#2 with LNO channel(s) in thermal orbit nr. 212 with orbit type nr. 14
TC20 execution start time (UTC): 2019 OCT 02 00:09:04
TC20 execution end time (UTC): 2019 OCT 02 01:19:14
LNO start time (UTC): 2019 OCT 02 00:09:14
LNO end time (UTC): 2019 OCT 02 01:19:14
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 2410
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 4200
LNO_COP_GENERAL = 2
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 446
LNO_COP_SCIENCE_2 = 447
UVIS_START_TIME = 0
UVIS_DURATION_TIME = 0
UVIS_COP_ROW = 0
CHECKSUM = 795
-------------------------------------------------------------------------------------------------------------


SO: Science: orders #164, #164, #164, #164, #164, #164, with 4000us integration time (6 orders per 1 second(s) for detector lines 120 to 136)
UVIS: SO: Horizontal Bin (140:205;0:1047), Tint = 45 ms,20 bit,Rhythm = 1057 ms, Binning=7

Calibration : Solar line scan #1 with SO and UVIS channel(s) in orbit nr. 8528
Calibration : Solar line scan #1 with SO and UVIS channel(s) on dayside nr. 201
Calibration : Solar line scan #1 with SO and UVIS channel(s) nr. 1
Calibration : Solar line scan #1 with SO and UVIS channel(s) in thermal orbit nr. 201 with orbit type nr. 14
TC20 execution start time (UTC): 2019 OCT 22 01:39:39
TC20 execution end time (UTC): 2019 OCT 22 02:33:49
SO start time (UTC): 2019 OCT 22 01:39:49
SO end time (UTC): 2019 OCT 22 02:33:49
UVIS start time (UTC): 2019 OCT 22 01:49:49
UVIS end time (UTC): 2019 OCT 22 02:33:49
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 3240
SO_COP_GENERAL = 1
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 3973
SO_COP_SCIENCE_2 = 3973
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 610
UVIS_DURATION_TIME = 2640
UVIS_COP_ROW = 394
CHECKSUM = 1062
-------------------------------------------------------------------------------------------------------------


SO: Science: orders #164, #164, #164, #164, #164, #164, with 4000us integration time (6 orders per 1 second(s) for detector lines 120 to 136)
UVIS: SO: Horizontal Bin (140:205;0:1047), Tint = 45 ms,20 bit,Rhythm = 1057 ms, Binning=7

Calibration : Solar line scan #2 with SO and UVIS channel(s) in orbit nr. 8600
Calibration : Solar line scan #2 with SO and UVIS channel(s) on dayside nr. 274
Calibration : Solar line scan #2 with SO and UVIS channel(s) nr. 2
Calibration : Solar line scan #2 with SO and UVIS channel(s) in thermal orbit nr. 274 with orbit type nr. 3
TC20 execution start time (UTC): 2019 OCT 28 00:38:06
TC20 execution end time (UTC): 2019 OCT 28 01:32:16
SO start time (UTC): 2019 OCT 28 00:38:16
SO end time (UTC): 2019 OCT 28 01:32:16
UVIS start time (UTC): 2019 OCT 28 00:48:16
UVIS end time (UTC): 2019 OCT 28 01:32:16
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 1356
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 3240
SO_COP_GENERAL = 1
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 3973
SO_COP_SCIENCE_2 = 3973
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 610
UVIS_DURATION_TIME = 2640
UVIS_COP_ROW = 394
CHECKSUM = 1062
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 19614 to 20634kHz in steps of 4kHz (1 step(s) per 1 second(s))

Calibration : Mini-scan #1 with SO channel(s) in orbit nr. 8837
Calibration : Mini-scan #1 with SO channel(s) on dayside nr. 169
Calibration : Mini-scan #1 with SO channel(s) nr. 1
Calibration : Mini-scan #1 with SO channel(s) in thermal orbit nr. 169 with orbit type nr. 14
TC20 execution start time (UTC): 2019 NOV 16 10:01:41
TC20 execution end time (UTC): 2019 NOV 16 11:11:51
SO start time (UTC): 2019 NOV 16 10:01:51
SO end time (UTC): 2019 NOV 16 11:11:51
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 2410
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 4200
SO_COP_GENERAL = 3
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 198
SO_COP_SCIENCE_2 = 198
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 0
UVIS_DURATION_TIME = 0
UVIS_COP_ROW = 0
CHECKSUM = 809
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 19614 to 20634kHz in steps of 4kHz (1 step(s) per 1 second(s))

Calibration : Mini-scan #2 with SO channel(s) in orbit nr. 8876
Calibration : Mini-scan #2 with SO channel(s) on dayside nr. 208
Calibration : Mini-scan #2 with SO channel(s) nr. 2
Calibration : Mini-scan #2 with SO channel(s) in thermal orbit nr. 208 with orbit type nr. 14
TC20 execution start time (UTC): 2019 NOV 19 14:40:25
TC20 execution end time (UTC): 2019 NOV 19 15:50:35
SO start time (UTC): 2019 NOV 19 14:40:35
SO end time (UTC): 2019 NOV 19 15:50:35
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 2410
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 4200
SO_COP_GENERAL = 3
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 130
SO_COP_SCIENCE_2 = 130
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 0
UVIS_DURATION_TIME = 0
UVIS_COP_ROW = 0
CHECKSUM = 673
-------------------------------------------------------------------------------------------------------------


LNO: Diffraction order stepping (fullscan): 105 orders from 110 to 215 in steps of 1 (1 order(s) per 1 second(s))

Calibration : Full-scan #1 with LNO channel(s) in orbit nr. 9091
Calibration : Full-scan #1 with LNO channel(s) on dayside nr. 81
Calibration : Full-scan #1 with LNO channel(s) nr. 1
Calibration : Full-scan #1 with LNO channel(s) in thermal orbit nr. 81 with orbit type nr. 14
TC20 execution start time (UTC): 2019 DEC 07 05:16:55
TC20 execution end time (UTC): 2019 DEC 07 06:27:05
LNO start time (UTC): 2019 DEC 07 05:17:05
LNO end time (UTC): 2019 DEC 07 06:27:05
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 2410
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 4200
LNO_COP_GENERAL = 3
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 34
LNO_COP_SCIENCE_2 = 34
UVIS_START_TIME = 0
UVIS_DURATION_TIME = 0
UVIS_COP_ROW = 0
CHECKSUM = 481
-------------------------------------------------------------------------------------------------------------


LNO: Diffraction order stepping (fullscan): 105 orders from 110 to 215 in steps of 1 (1 order(s) per 1 second(s))

Calibration : Full-scan #1 with LNO channel(s) in orbit nr. 9450
Calibration : Full-scan #1 with LNO channel(s) on dayside nr. 97
Calibration : Full-scan #1 with LNO channel(s) nr. 1
Calibration : Full-scan #1 with LNO channel(s) in thermal orbit nr. 97 with orbit type nr. 14
TC20 execution start time (UTC): 2020 JAN 05 13:23:10
TC20 execution end time (UTC): 2020 JAN 05 14:33:20
LNO start time (UTC): 2020 JAN 05 13:23:20
LNO end time (UTC): 2020 JAN 05 14:33:20
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 2410
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 4200
LNO_COP_GENERAL = 3
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 34
LNO_COP_SCIENCE_2 = 34
UVIS_START_TIME = 0
UVIS_DURATION_TIME = 0
UVIS_COP_ROW = 0
CHECKSUM = 481
-------------------------------------------------------------------------------------------------------------


SO: AOTF frequency stepping (miniscan): 255 frequencies from 20052 to 21072kHz in steps of 4kHz (1 step(s) per 1 second(s))
SO: AOTF frequency stepping (miniscan): 255 frequencies from 19614 to 21654kHz in steps of 8kHz (1 step(s) per 1 second(s))

Calibration : Mini-scan #1+#2 with SO channel(s) in orbit nr. 9536
Calibration : Mini-scan #1+#2 with SO channel(s) on dayside nr. 183
Calibration : Mini-scan #1+#2 with SO channel(s) nr. 1+2
Calibration : Mini-scan #1+#2 with SO channel(s) in thermal orbit nr. 183 with orbit type nr. 14
TC20 execution start time (UTC): 2020 JAN 12 14:26:42
TC20 execution end time (UTC): 2020 JAN 12 15:36:52
SO start time (UTC): 2020 JAN 12 14:26:52
SO end time (UTC): 2020 JAN 12 15:36:52
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 10
SO_START_SCIENCE_1 = 610
SO_START_SCIENCE_2 = 2410
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 4200
SO_COP_GENERAL = 3
SO_COP_PRECOOLING = 1
SO_COP_SCIENCE_1 = 199
SO_COP_SCIENCE_2 = 226
LNO_START_TIME = 0
LNO_START_SCIENCE_1 = 0
LNO_START_SCIENCE_2 = 0
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 0
LNO_COP_GENERAL = 0
LNO_COP_PRECOOLING = 0
LNO_COP_SCIENCE_1 = 0
LNO_COP_SCIENCE_2 = 0
UVIS_START_TIME = 0
UVIS_DURATION_TIME = 0
UVIS_COP_ROW = 0
CHECKSUM = 838
-------------------------------------------------------------------------------------------------------------


LNO: AOTF frequency stepping (miniscan): 255 frequencies from 28176 to 29196kHz in steps of 4kHz (1 step(s) per 1 second(s))
LNO: AOTF frequency stepping (miniscan): 255 frequencies from 29096 to 30116kHz in steps of 4kHz (1 step(s) per 1 second(s))

Calibration : Mini-scan #1+#2 with LNO channel(s) in orbit nr. 9773
Calibration : Mini-scan #1+#2 with LNO channel(s) on dayside nr. 79
Calibration : Mini-scan #1+#2 with LNO channel(s) nr. 1+2
Calibration : Mini-scan #1+#2 with LNO channel(s) in thermal orbit nr. 79 with orbit type nr. 14
TC20 execution start time (UTC): 2020 FEB 01 00:16:21
TC20 execution end time (UTC): 2020 FEB 01 01:26:31
LNO start time (UTC): 2020 FEB 01 00:16:31
LNO end time (UTC): 2020 FEB 01 01:26:31
-------------------------------------- TC20 PARAMETERS IN DEC ------------------------------------------------
SO_START_TIME = 0
SO_START_SCIENCE_1 = 0
SO_START_SCIENCE_2 = 0
SO_DURATION_REFERENCE_1 = 0
SO_DURATION_REFERENCE_2 = 0
SO_DURATION_TIME = 0
SO_COP_GENERAL = 0
SO_COP_PRECOOLING = 0
SO_COP_SCIENCE_1 = 0
SO_COP_SCIENCE_2 = 0
LNO_START_TIME = 10
LNO_START_SCIENCE_1 = 610
LNO_START_SCIENCE_2 = 2410
LNO_DURATION_REFERENCE_1 = 0
LNO_DURATION_REFERENCE_2 = 0
LNO_DURATION_TIME = 4200
LNO_COP_GENERAL = 3
LNO_COP_PRECOOLING = 1
LNO_COP_SCIENCE_1 = 227
LNO_COP_SCIENCE_2 = 229
UVIS_START_TIME = 0
UVIS_DURATION_TIME = 0
UVIS_COP_ROW = 0
CHECKSUM = 869
-------------------------------------------------------------------------------------------------------------



Page last modified: Fri, 06 Mar 2020 17:26:58